BLD11-01759
| FIRE-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 4:05:32 PM | A | FAIL |
|
|
The door hardware for doors 109A and 109B does not match the approved plans, door schedules, on sheet A4. A fire watch was also required but has not been approved by the fire marshal. The project related fire sprinkler permit is finaled but the project related fire alarm permit has not been reviewed, issued, installed or inspected. A final building inspection has not been scheduled by the contractor.
|
BLD11-01636
| FIRE-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 3:06:05 PM | P | FAIL |
|
|
Needs the single action hardware installed on all of the basement doors and the door at the top of the stairs. The sheet rock on the basement ceiling will be inspected by the building inspector.
|
FIR11-00564
| INSP-Sprinkler Rough-in | 10/28/2011 | 10/28/2011 | 10/28/2011 2:04:15 PM | P | FAIL |
|
|
Tony Phone #: ###-####. I left a message on the contacts voice mail. I went to the job site and found no plans or contact. No inspection was performed.
|
BLD11-01189
| FIRE-Conference | 10/27/2011 | 10/28/2011 | 10/28/2011 1:40:16 PM | A | DONE |
|
|
I went over door hardware issues and exit sign placement. Emergency lighting is not required per plan review.
|
FIR11-00553
| INSP-Final Inspection | 10/26/2011 | 10/28/2011 | 10/28/2011 12:02:42 PM | A | PASS |
|
|
permit finaled
|
BLD11-01913
| FIRE-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 11:28:38 AM | A | FAIL |
|
|
The project related fire sprinkler permit can not be finaled at this time. Contractor was going to reschedule for next week.
|
FIR11-00508
| INSP-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 11:19:33 AM | A | FAIL |
|
|
The ceiling tile is still installed. No inspection performed. General contractor is going to scheduled for next week.
|
FIR11-00478
| INSP-Final Inspection | 10/27/2011 | 10/28/2011 | 10/28/2011 11:18:13 AM | A | PASS |
|
|
permit finaled
|