Inspections for the day of: Friday, October 28, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-01759 FIRE-Final Inspection10/27/201110/28/201110/28/2011 4:05:32 PMAFAIL
The door hardware for doors 109A and 109B does not match the approved plans, door schedules, on sheet A4. A fire watch was also required but has not been approved by the fire marshal. The project related fire sprinkler permit is finaled but the project related fire alarm permit has not been reviewed, issued, installed or inspected. A final building inspection has not been scheduled by the contractor.
BLD11-01636 FIRE-Final Inspection10/27/201110/28/201110/28/2011 3:06:05 PMPFAIL
Needs the single action hardware installed on all of the basement doors and the door at the top of the stairs. The sheet rock on the basement ceiling will be inspected by the building inspector.
FIR11-00564 INSP-Sprinkler Rough-in10/28/201110/28/201110/28/2011 2:04:15 PMPFAIL
Tony Phone #: ###-####. I left a message on the contacts voice mail. I went to the job site and found no plans or contact. No inspection was performed.
BLD11-01189 FIRE-Conference10/27/201110/28/201110/28/2011 1:40:16 PMADONE
I went over door hardware issues and exit sign placement. Emergency lighting is not required per plan review.
FIR11-00553 INSP-Final Inspection10/26/201110/28/201110/28/2011 12:02:42 PMAPASS
permit finaled
BLD11-01913 FIRE-Final Inspection10/27/201110/28/201110/28/2011 11:28:38 AMAFAIL
The project related fire sprinkler permit can not be finaled at this time. Contractor was going to reschedule for next week.
FIR11-00508 INSP-Final Inspection10/27/201110/28/201110/28/2011 11:19:33 AMAFAIL
The ceiling tile is still installed. No inspection performed. General contractor is going to scheduled for next week.
FIR11-00478 INSP-Final Inspection10/27/201110/28/201110/28/2011 11:18:13 AMAPASS
permit finaled