Inspections for the day of: Friday, October 28, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-00946 BLD-Conference10/28/201110/28/201110/28/2011 3:18:26 PMPPART
Interior steel stud framing, 2nd. floor, work in progress. Ok to one side after electrical rough in.
ESC10-00670 BMP Violation10/28/201110/28/201110/28/2011 3:17:36 PMPPASS
ESC10-00670 Tracking Control10/28/201110/28/201110/28/2011 3:17:23 PMPPASS
BLD10-02069 BLD-Conference10/26/201110/28/201110/28/2011 11:39:29 AMAPASS
Chiller room walls. Formwork and rebar. Concrete scheduled for 1:00 Friday. Rebar is ready to inspect any time Thursday all doay or Friday morning. Special inspector scheduled for Thursday to look at rebar. Special inspector scheduled for Friday at 1:00 to cast 2 sets of cylinders during pour Phone #: ###-#### >> Inspection requested via web by Scott GreerW3 and W5 type walls ok. as per plans and RFI's.
ESC11-00746 Random Inspection10/28/201110/28/201110/28/2011 11:00:25 AMAPASS
BLD11-02511 BLD-Foundation10/27/201110/28/201110/28/2011 11:00:12 AMAPASS
Tim Phone #: ###-####
GCB11-00041 GCB-Framing10/27/201110/28/201110/28/2011 9:45:50 AMAFAIL
Chad @ ###-####Call for access. Called for access, no return call back, was able to gain access(window contractor working. Needs to provide city approved plans, complete all airseal, fireblocking and firestopping prior to framing inspection. Correction notice was posted.
GCB11-00076 GCB-Final10/27/201110/28/201110/28/2011 9:17:23 AMAPASS
Duane @ ###-####Call in advance - AM Inspection. Structural final ok. Additional smoke detector was added and CO2 detectors were installed.