Inspections for the day of: Wednesday, October 28, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-03071 Final10/28/201510/28/201510/28/2015 4:39:28 PMPFAIL
Phone #: ###-#### Inspection requested via web by Andrea Creek 210.63- a 120 volt 15 or 20 amp receptacle shall be installed at an accessable location for the servicing of HVAC equipment. within 25 feet. 400.14-weathertite cord grip required for exterior connection.
ELE15-03429 Final10/28/201510/28/201510/28/2015 4:03:01 PMPPASS
Robert Phone #: ###-#### final ok
ELE15-02740 Electrical Rough-In10/28/201510/28/201510/28/2015 3:24:28 PMPPASS
Jacob Phone #: ###-#### r/i ok tie 4 corners of pool bond wires to equipotintial grid and handicap lift and corner rail for pool ok
ELE15-03462 Final10/27/201510/28/201510/28/2015 2:57:20 PMPPASS
Underground service, upgrade to 200 Amps. Panel is inside garage. door should be open in case we are not there. Please call if there are any issues. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb final ok
ELE15-03462 Permanent Service10/28/201510/28/201510/28/2015 2:47:48 PMPPASS
Underground service, upgrade to 200 Amps. Panel is inside garage. door should be open in case we are not there. Please call if there are any issues. Thanks Phone #: ###-#### Inspection requested via web by Troy Cobb p/s u/g rec ok
ELE15-03478 Rough-In Permanent Service10/28/201510/28/201510/28/2015 2:34:38 PMPPASS
Phone #: ###-#### Inspection requested via web by Shaun Kirkman r/i ok p/s u/g n ok
ELE15-03341 Final10/28/201510/28/201510/28/2015 2:13:14 PMPPASS
Phone #: ###-#### Inspection requested via web by Randy Fletcher final ok microwave circuit
ELE15-02161 Electrical Rough-In10/28/201510/28/201510/28/2015 1:52:49 PMPPASS
on the east end of the new Greenhouse underground inspection please Phone #: ###-#### Inspection requested via web by Celinda Winters u. ground to generator pad from greenhouse ok
ELE15-03399 Final10/28/201510/28/201510/28/2015 1:24:02 PMPPASS
We need final for the front two rooms and the 100amp sub panel. Thank you Phone #: ###-#### Inspection requested via web by Thomas Jenkins final ok
ELE15-01867 Final10/28/201510/28/201510/28/2015 12:50:34 PMPPASS
Matt// please call for access Phone #: ###-#### final ok permenent occupancy ok
GCE15-00160 GCE-Temporary Service10/28/201510/28/201510/28/2015 12:13:26 PMACANC
David ###-#### already inspected and passed
GCE14-00207 GCE-Final10/28/201510/28/201510/28/2015 12:12:34 PMACANC
Kevin ###-#### already inspected
ELE15-03380 Electrical Rough-In10/27/201510/28/201510/28/2015 11:44:14 AMAPASS
Contact is Robert Gates Phone #: ###-#### Inspection requested via web by Scott Campbell r/i ok u. ground conduits to 3 light poles
ELE15-02822 Electrical Rough-In10/27/201510/28/201510/28/2015 11:17:41 AMAPASS
2 bathrooms Phone #: ###-#### Inspection requested via web by Jim Williams r/i 2 bath walls and hard lids ok
ELE09-02129 ELE-Aging Inspection10/28/201510/28/201510/28/2015 11:00:00 AM DONE
too busy
ELE15-02717 Final10/27/201510/28/201510/28/2015 10:55:46 AMPPASS
FOR QUESTIONS PLEASE CONTACT ELECTRICIAN BEN- ###-#### Phone #: ###-#### Inspection requested via web by SHAWN TOMLINSON corrections made final ok perm. occupancy ok
GCE14-00207 GCE-Final10/28/201510/28/201510/28/2015 10:13:59 AMAFAIL
Kevin ###-####-1st floor-10 units 210.8 (A)(7)- Gfci protection required within 6' of sinks
GCE15-00160 GCE-Temporary Service10/28/201510/28/201510/28/2015 8:40:28 AMAPASS
David ###-#### correction made t/s u/g n ok