Inspections for the day of: Wednesday, October 28, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03868 FIRE-Final Inspection10/28/201510/28/201510/28/2015 2:33:25 PMPPASS
Life fire safety passed/complete
FIR15-00633 INSP-Sprinkler Rough-in/Hydro10/28/201510/28/201510/28/2015 2:02:53 PMPPASS
Rough to cover inspection for underground passed/complete, approved for cover.
FIR15-00652 INSP-Final Inspection10/27/201510/28/201510/28/2015 12:21:56 PMAPASS
Final fire alarm inspection passed/complete
FIR15-00629 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:40:46 AMACANC
Not ready for inspection, Jeff will reschedule when ready.
BLD15-03190 FIRE-Final Inspection10/28/201510/28/201510/28/2015 11:39:36 AMAPASS
Life fire safety passed/complete
BLD15-01970 FIRE-Final Inspection10/28/201510/28/201510/28/2015 11:38:30 AMAPASS
Life fire safety passed/complete
FIR15-00667 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:37:16 AMAPASS
Final fire alarm inspection passed/complete
FIR15-00542 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:36:15 AMAPASS
Final fire alarm inspection passed/complete
FIR15-00628 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:35:29 AMAPASS
Final fire alarm inspection passed/complete
FIR15-00514 INSP-Sprinkler Rough-in/Hydro10/28/201510/28/201510/28/2015 11:33:28 AMPPASS
200 psi hydrostatic test for overhead fire sprinkler piping passed/complete
FIR15-00557 INSP-Final Inspection10/27/201510/28/201510/28/2015 11:32:11 AMAPASS
Final fire sprinkler inspection passed/complete
FIR15-00446 INSP-Final Inspection10/27/201510/28/201510/28/2015 11:31:08 AMAPASS
Final fire sprinkler inspection passed/complete
FIR15-00544 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:27:22 AMPPASS
Final underground fire sprinkler supply inspection passed/complete
FIR15-00545 INSP-Final Inspection10/28/201510/28/201510/28/2015 11:26:24 AMPPASS
Final underground fire sprinkler supply inspection passed/complete
BLD15-03868 FIRE-Final Inspection10/26/201510/28/201510/28/2015 9:55:25 AMAFAIL
Exit signs need to be serviced/repaired, several exit signs did not stay illuminated when test button was pushed. Emergency egress lighting needs to be serviced/repaired, several of the egress lights did not illuminate when test button was pushed. Was informed by POC Brandy, phone number ###-#### that batteries are on order and will be replaced. All exit signs/egress lighting needs to be operational/functional for next inspection.
FIR15-00544 INSP-Supply line flush10/26/201510/28/201510/28/2015 9:13:09 AMADONE
Main underground supply line flush complete.
FIR15-00545 INSP-Supply line flush10/26/201510/28/201510/28/2015 9:11:52 AMADONE
Main underground supply line flush complete.
BLD15-03859 FIRE-Final Inspection10/26/201510/28/201510/28/2015 8:45:20 AMAPASS
Life fire safety passed/complete for this permit, signed card on temporary line due to this being a temporary permit.