ESC14-00135
| General Inspection | 10/28/2015 | 10/28/2015 | 10/29/2015 1:43:36 PM | | PASS |
|
|
Hillside revegetation is now in progress. JH had the disturbed slope hydroseeded and a temporary sediment control wattle is now installed. Will monitor growth of grasses on slope.
|
ESC15-00477
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 3:14:31 PM | | PASS |
|
|
Crew just installed driveway and men sweeping loose dirt at time of inspection. Site should be done within 2-3 weeks and will not have trackout issues.
|
ESC15-00463
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 3:09:36 PM | | PASS |
|
|
WIP. Road has been swept and construction entrance improved since last week's storm. No new corrections. RP-GC alerted ESC divisions of issues and corrections last week.
|
ESC15-00862
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 2:30:14 PM | P | PASS |
|
|
WIP. Perimeter BMPs installed and slope has been tracked. Very sandy site with good infiltration and little runoff. No violations observed.
|
ESC15-00776
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 2:28:52 PM | P | PASS |
|
|
WIP on frame and interior walls. No hillside erosion behind house, despite some damage silt fence. Vegetative perimeter and sage brush has been preserved. Permit sign posted, trash contained, no trackout or discharges. Approved.
|
ESC15-00743
| Site Final | 10/28/2015 | 10/28/2015 | 10/28/2015 2:27:32 PM | P | PASS |
|
|
Work on pool and patio are complete and surrounding areas stabilized/landscaped. ESC permit sign removed, no remaining temp BMPs. Permit finaled.
|
ESC15-00210
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 1:44:31 PM | | PASS |
|
|
|
ESC15-00391
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 12:00:47 PM | | PART |
|
|
Culdesac paving, curb, and gutter are complete at Hickories East #3. Minor landscaping activity occuring along irrigation ditch line.
Corrections: 1. Sweep up loose sediment on sidewalk and gutter along Farrow Street 2. Sweep loose sediment along Fifeshire and block vechicle access/stabilize the 2 track dirt road that connects culdesac to Fifeshire in order to prevent future trackout and unauthorized use.
|
ESC15-00618
| Aging Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 11:06:35 AM | | PASS |
|
|
No disturbed area at site. No construction activity or material staging. BLD open, but project appears complete. No further ESC inspections.
|
ESC15-00618
| DOC - Permit Finaled | 10/28/2015 | 10/28/2015 | 10/28/2015 11:05:46 AM | P | PASS |
|
|
|
ESC15-00380
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 10:08:45 AM | | PASS |
|
|
WIP on interiors of 4-plexes. No sediment leaving site, though the interior parking lot will need thorough sweeping upon completion and striping. No discharges offsite.
|
ESC15-00484
| General Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 9:29:56 AM | | PASS |
|
|
WIP on home and site landscaping and pool area. See also ESC15-00006. No violations observed, no sediment runoff.
|
ESC15-00479
| Aging Inspection | 10/28/2015 | 10/28/2015 | 10/28/2015 8:47:37 AM | | PASS |
|
|
Work complete, are cleaned and stabilized.
|
ESC15-00479
| DOC - Permit Finaled | 10/28/2015 | 10/28/2015 | 10/28/2015 8:47:10 AM | P | PASS |
|
|
|