ELE15-01348
| Final | 10/28/2016 | 10/28/2016 | 10/28/2016 3:35:39 PM | P | FAIL |
|
|
temp final for Headquarters floos 2 thru 7 Tom ###-#### NFPA ###-#### Life Safety Code, Section 7.8 and 7.9- Exterior egress for stairs 2 and 3 shall have an outdoor generated light source on life safety circuits which produce a minimum of 1ft candle per square ft of illumination.
|
ELE15-01348
| Conference | 10/28/2016 | 10/28/2016 | 10/28/2016 12:38:25 PM | A | DONE |
|
|
Site Frank ###-####, Core and shell Tom ###-#### Discussed possibility of temp occupancy for floors 2 thru 7. Outdoor egress lighting not complete for stair 1. Contractor trying to have lighting temp feed from emergency circuits done. Asked to recheck at 2pm today.
|
ELE16-00089
| Electrical Rough-In | 10/27/2016 | 10/28/2016 | 10/28/2016 10:34:30 AM | A | PASS |
|
|
Call Cody for inspection of ceiling grid in kitchen. Late morning preferred. Phone #: ###-#### requested via web by Rafael Castillo Area noted rough in ok cover
|
ELE15-00495
| Final | 10/28/2016 | 10/28/2016 | 10/28/2016 10:33:14 AM | A | PASS |
|
|
Fire caulked 7th floor electrical room wall. Installed arch flash stickers. We are opening up a new permit for open items. Contact is Eric Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Core and shell final ok
|
ELE16-02363
| Electrical Rough-In | 10/27/2016 | 10/28/2016 | 10/28/2016 9:54:22 AM | A | PASS |
|
|
Max Phone #: ###-#### Bath entrance and baths hardlid rough in ok cover
|
ELE16-03415
| Rough-In Permanent Service | 10/27/2016 | 10/28/2016 | 10/28/2016 9:20:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough in ok cover p/s u/g n ok
|
ELE16-03453
| Rough-In Permanent Service | 10/27/2016 | 10/28/2016 | 10/28/2016 8:57:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Charles Davis Rough in ok cover p/s u/g n ok
|