Inspections for the day of: Friday, October 28, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02290 BLD-Final10/28/201610/28/201610/28/2016 4:12:19 PMPDONE
Caleb Phone #: ###-####
BLD16-02290 DOC - Permit Finaled10/28/201610/28/201610/28/2016 4:12:05 PMPPASS
BLD16-03080 BLD-Framing/Rough-in10/28/201610/28/201610/28/2016 3:40:28 PMPPART
Antonio Phone #: ###-####. Interior steel stud framed walls and hardlid ok. Pending MEP rough in inspections.
BLD16-01761 BLD-Framing/Rough-in10/28/201610/28/201610/28/2016 3:21:36 PMPPASS
Cameron-stair case Phone #: ###-####
BLD16-03747 BLD-Framing/Rough-in10/28/201610/28/201610/28/2016 2:51:40 PMPFAIL
Cyrus Phone #: ###-####. Provide the 16x16x8 column pad footing in crawl and 4x4 to pick up the 2 ply LVL load. Provide connectors at beam to column connections and (2) 2x4 studs in existing wall for the LVL.
BLD16-03345 BLD-Energy code compliance10/28/201610/28/201610/28/2016 1:54:44 PMPPASS
Phone #: 2085015747 >> Inspection requested via mobile web by Thomas Lane
BLD16-02700 BLD-Energy code compliance10/28/201610/28/201610/28/2016 1:54:33 PMPPASS
Brett Phone #: ###-####
BLD16-03740 BLD-Framing/Rough-in10/28/201610/28/201610/28/2016 1:54:20 PMPNR
Brad Phone #: ###-####. Needs electrical rough in inspection and provide truss engineering. ok to cover exterior only.
BLD16-03740 BLD-Wall Bracing10/28/201610/28/201610/28/2016 1:53:26 PMPPASS
Brad Phone #: ###-####
BLD16-03309 BLD-Final10/28/201610/28/201610/28/2016 1:25:32 PMPPASS
Steve Phone #: ###-####
BLD16-03309 DOC - Permit Finaled10/28/201610/28/201610/28/2016 1:25:23 PMPPASS
BLD16-03309 BLD-Framing/Rough-in10/28/201610/28/201610/28/2016 1:25:10 PMPPASS
Steve Phone #: ###-####
BLD16-03831 BLD-Final10/27/201610/28/201610/28/2016 10:46:29 AMAPASS
between 10 - 10:30 please call ahead for access; Tsering Phone #: ###-####. Ok for perm occ.
BLD16-03309 BLD-Final10/27/201610/28/201610/28/2016 8:57:57 AMAFAIL
Call half hour before to meet // Jeff Phone #: ###-####. Add the additional 5/8 through bolts at truss to 6x8 connectiions and additional nails to 2x8 below.
BLD16-03345 BLD-Energy code compliance10/26/201610/28/201610/28/2016 8:28:21 AMAPASS
Tom Phone #: ###-####