BLD19-01694
| BLD-Framing/Rough-in | 10/28/2019 | 10/28/2019 | 10/28/2019 3:54:40 PM | P | PART |
|
|
Willie Phone #: ###-####//add fireblocking at concealed spaces//add nails to girder trusses per engineering//ok to insulate only//
|
BLD19-03845
| BLD-Final | 10/28/2019 | 10/28/2019 | 10/28/2019 3:33:28 PM | P | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by Andrew Sunderland//new roof flashings added//roof appears to be installed within code requirements//
|
BLD19-03845
| DOC - Permit Finaled | 10/28/2019 | 10/28/2019 | 10/28/2019 3:31:37 PM | P | PASS |
|
|
|
BLD19-03123
| BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 2:59:46 PM | A | PASS |
|
|
Gary Phone #: ###-####/
|
BLD19-03124
| BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 2:58:42 PM | P | PART |
|
|
Gary Phone #: ###-####//need to add truss clips and anchor bolts at plate ends//
|
BLD19-03659
| BLD-Foundation | 10/25/2019 | 10/28/2019 | 10/28/2019 2:30:46 PM | P | PART |
|
|
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//forman says blanket crew is on their way to cover//confirmed with Mark//
|
BLD19-03657
| BLD-Foundation | 10/25/2019 | 10/28/2019 | 10/28/2019 2:30:09 PM | P | PART |
|
|
wall... 2 if possible // Mark Phone #: ###-####//ok per plans//blankets are the way//confirmed with Mark//
|
BLD19-03424
| BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 1:57:33 PM | A | PASS |
|
|
James Phone #: ###-####//add bearing under ridge beam//ok to cover//
|
BLD19-03122
| BLD-Energy code compliance | 10/28/2019 | 10/28/2019 | 10/28/2019 1:31:22 PM | P | PASS |
|
|
Nick Phone #: ###-####//corrections made//ok to cover//
|
BLD19-01828
| BLD-Foundation | 10/28/2019 | 10/28/2019 | 10/28/2019 12:45:42 PM | P | CANC |
|
|
CMU rebar. Grout pour is scheduled for 1:45 pm. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD19-01873
| BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 12:33:55 PM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall//correction notice posted onsite//need a few framing corrections//ok to insulate only//
|
BLD19-01055
| BLD-Framing/Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 12:23:35 PM | A | NR |
|
|
call half hour before // John Phone #: ###-####//wanted to do walk through prior to trades rough ins//discussed some issues an noted areas to double check prior to framing inspection//framing inspection will need to be completed after rough ins are inspected and passed//still need engineering fix for garage door areas where hold downs were removed//
|
BLD19-03837
| BLD-Framing/Rough-in | 10/28/2019 | 10/28/2019 | 10/28/2019 11:56:44 AM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting//no work needed to existing structure--no framing inspeciton needed//
|
BLD19-02511
| BLD-Foundation | 10/26/2019 | 10/28/2019 | 10/28/2019 10:44:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Edgar Sanchez//blankets onsite//
|
BLD19-03555
| BLD-Footing | 10/25/2019 | 10/28/2019 | 10/28/2019 10:11:28 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//discussed cold weather concrete practices and inspection prcedures//
|
BLD18-00847
| BLD-Conference | 10/25/2019 | 10/28/2019 | 10/28/2019 9:43:49 AM | A | DONE |
|
|
Dan is helping owner and wants to meet//###-####//
|
BLD19-02502
| BLD-Footing | 10/25/2019 | 10/28/2019 | 10/28/2019 9:32:41 AM | A | PART |
|
|
Plans will be available on site. Call number if there''s any problem finding them.
Thanks, Phone #: ###-#### Inspection requested via web by David Snow//will need cold weather protection//no frost present at this time//special inspections will need to be completed per approved plans and engineering//
|
BLD19-00829
| BLD-Final | 10/25/2019 | 10/28/2019 | 10/28/2019 9:09:50 AM | A | PASS |
|
|
smoke detectors added//final complete//
|
BLD19-00829
| DOC - Permit Finaled | 10/28/2019 | 10/28/2019 | 10/28/2019 9:09:22 AM | P | PASS |
|
|
|