BLD97-02769
| INSP-Final Inspection | 10/29/1998 | 10/29/1998 | 10/29/1998 12:00:00 AM | A | FAIL |
|
|
remove tape from heads, remove gas pipe from sprinkler piping, change head in generator room
|
BLD98-01122
| INSP-Sprinkler Rough-in/Hydro | 10/28/1998 | 10/29/1998 | 10/29/1998 12:00:00 AM | A | NR |
|
|
MIKE ###-#### FIRE INSP window sprinkler system not complete
|
BLD98-02373
| INSP-Final Inspection | 10/29/1998 | 10/29/1998 | 10/29/1998 12:00:00 AM | A | PASS |
|
|
occ approved
|
BLD98-02386
| INSP-Conference | 10/29/1998 | 10/29/1998 | 10/29/1998 12:00:00 AM | A | PART |
|
|
plans indicate to remove all halon alarm system - contractor notified
|
BLD98-02917
| INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/29/1998 | 10/29/1998 12:00:00 AM | P | PASS |
|
|
MARK ###-#### CALL FIRST
|