ELE99-02785
| Temporary Service | 10/28/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 13:25:23. Contact: ###-####. Temp. occ. Only
|
ELE99-03511
| Electrical Rough-In | 10/28/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 07:36:11. Contact: ###-####. Sutie #104 Ele. R/I; walls
|
ELE99-03173
| Final | 10/28/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/1999 at 11:13:26. Contact: ###-####. Ok
|
ELE99-00046
| Final | 10/28/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | P | FAIL |
|
|
LATE PM IF POSSIBLE CHUCK ###-#### need light on outside of door, everything else is ok for final- electrical contractor was present.
|
ELE99-03787
| Final | 10/28/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | P | PART |
|
|
shawn ###-#### pager suite 120 and final 2nd floor Ok final
|
ELE99-01763
| Electrical Rough-In | 10/29/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | P | PASS |
|
|
key is in the main breaker on side of house patrick ###-#### ###-#### at work OK cover R/I
|
ELE99-03118
| Electrical Rough-In | 10/29/1999 | 10/29/1999 | 10/29/1999 12:00:00 AM | P | PASS |
|
|
tom ###-#### Ok cover R/I
|