BLD00-02769
| BLD-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | | PART |
|
|
|
BLD01-02066
| BLD-Aging Inspection | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | | PART |
|
|
|
BLD00-02920
| BLD-Wall cover | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 10/29/2001 10:51:17 AM . Ok to place ceiling tile at main floor only. 10/29/2001 10:54:16 AM
|
BLD01-01633
| BLD-Framing/Rough-in | 10/26/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | A | PART |
|
|
###-#### JIM PLEASE CALL BEFORE GOING OUT . Need to install fire dampers at shaft indicated on plans 2nd floor , need to repair shaft at fire place, need to seal shaft at first floor at new duct with22 in rise, refridgerator box in corridor wall needs to be addressed may move location out of wall. Ok to cover walls at non affected areas.10/29/2001 12:31:09 PM floor 10/29/2001 12:31:14 PM 10/29/2001 12:32:02 PM o 10/29/2001 12:32:07 PM 10/29/2001 12:32:50 PM 10/29/2001 12:33:18 PM
|
BLD01-00106
| BLD-Framing/Rough-in | 10/26/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 11:33:27. Contact: ###-####.Contractor here on site said 340 came by on friday pm. 10/29/2001 1:23:34 PM
|
BLD01-01349
| BLD-Final | 10/26/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | A | PART |
|
|
###-#### DAVID. Appears all required signatures are on card , Mechanical has been finaled, need to know what 340 wanted else wise may need to lower restroom mirrors to 40 In. Will wait for 340 to return to work, Spoke with Dave at site. 10/29/2001 1:05:00 PM
|
BLD01-02718
| BLD-Final | 10/26/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 14:41:11. Contact: ###-####. Will recall for this Wendsday. 10/29/2001 1:38:17 PM
|
BLD01-01442
| BLD-Final | 10/26/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | P | FAIL |
|
|
###-#### TRAVIS . item on prior c/n flame/smoke for vapor barier in upper bonus room. 10/29/2001 4:03:33 PM
|
BLD00-01649
| BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | P | FAIL |
|
|
###-#### mel. Recall fourth fourth floor, add pods in rooms over 144 sq ft also will need to check above all of the 1 hour cooridor and 2 hour horz exit wall both sides for penetrations. Also need to review for location of 2 hr horiz wall. 10/29/2001 4:28:36 PM
|
BLD01-02099
| BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | P | FAIL |
|
|
###-#### DAVID SHEER WALL . c/n staraps at 2nd floor and shear see plans. 10/29/2001 2:36:50 PM
|
BLD01-01729
| BLD-Framing/Rough-in | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | P | FAIL |
|
|
###-#### DAVID. No plans on site posted c/n also check plans when on site for north wall shear and floor to floor straps. 10/29/2001 2:37:54 PM
|
BLD01-01601
| BLD-Final | 10/29/2001 | 10/29/2001 | 10/29/2001 12:00:00 AM | P | CANC |
|
|
###-####. will do am. 10/29/2001 4:32:22 PM
|