BLD02-01920
| BLD-Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PASS |
|
|
w/ bldr re: block out sewer at fnd. 10/29/02 9:46:35 AM
|
BLD02-01674
| BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 15:40:16. Contact: ###-####....part, need change stairs to mezz...ok to add duct wrap at horiz. portion of grease duct prior to shaft...maintain clearances 10/29/02 5:00:11 PM
|
BLD02-00175
| BLD-Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PASS |
|
|
need 1hr door at laundry 10/29/02 4:53:50 PM
|
BLD02-01920
| BLD-Foundation | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PART |
|
|
rebar tied to existing, ok; connect ufer to vert steel in ftg...consult electrician.
|
BLD02-01883
| BLD-Conference | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
fire ok 10/29/02 5:20:39 PM
|
MEC02-03131
| Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | NR |
|
|
###-#### cell ###-####
|
MEC02-03131
| Pressure Test | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-01382
| BLD-Final | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### JASON
|
BLD02-01920
| BLD-Foundation | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 16:57:08. Contact: ###-####.
|
BLD02-01256
| BLD-Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 08:50:21. Contact: ###-####....reschedule. 10/29/02 4:58:25 PM
|