MEC02-00596
| Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PART |
|
|
final for room 4s218,201,202,203 10/29/2002 1:58:34 PM
|
MEC02-02375
| Final | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-03119
| Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | FAIL |
|
|
remove air connector at fans, need duct smoke detectors 10/29/2002 2:43:57 PM
|
MEC02-02343
| Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | FAIL |
|
|
need clearance above gas range top to cabinets 10/29/2002 2:44:32 PM
|
MEC02-03050
| Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 09:37:26. Contact: ###-####.
|
MEC02-02606
| Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 11:22:47. Contact: ###-####.
|
MEC02-03132
| Final | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
PLEASE INSPECT AT APPROXIMATELY 3:30. IF ANY PROBLEMS GIVE ME A CALL
THANKS
CAROL ; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
MEC01-03864
| Conference | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | DONE |
|
|
pt and inspection witnessed by intermountain gas. tag at meter 10/29/2002 5:21:11 PM
|