Inspections for the day of: Tuesday, October 29, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00273 BLD-Conference10/29/200210/29/200210/29/2002 12:00:00 AM CANC
DOING ROOF WITHOUT A BLD PERMIT. BACK ON 5/06/02 THERE WAS A PERMIT TAKEN OUT FOR REHAB MIS02-00115 IF ANY QUESTIONS CALL ME ANNETTE> Out of time today set this back up for tomorow. 10/29/2002 4:42:30 PM
BLD02-02337 BLD-Wall cover10/28/200210/29/200210/29/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/28/2002 at 10:31:06. Contact: ###-####.posted c/n. 10/29/2002 1:56:01 PM
BLD02-02003 BLD-Framing/Rough-in10/28/200210/29/200210/29/2002 12:00:00 AMAPASS
###-#### 10/28/2002 12:22:40 PM. Ok to side Talked with framer about shear requirements in the UBC, as he does most work out of town and this inspection is not required also explained the process of getting all trades approved prior to an interior frame inspection. 10/29/2002 10:19:34 AM
BLD02-01851 BLD-Framing/Rough-in10/28/200210/29/200210/29/2002 12:00:00 AMAPART
###-####. still makeing repairs. 10/29/2002 2:27:29 PM
BLD02-01294 BLD-Final10/28/200210/29/200210/29/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/28/2002 at 19:12:00. Contact: ###-####.posted c/n. 10/29/2002 10:51:45 AM
MEC01-03448 Final10/29/200210/29/200210/29/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/29/2002 at 08:26:49. Contact: ###-####.posted c/n needs a trim colar at attic ceiling line at flue pipe. 10/29/2002 1:52:38 PM
BLD02-01461 BLD-Framing/Rough-in10/28/200210/29/200210/29/2002 12:00:00 AMPPART
###-####still makeing rwepairs. 10/29/2002 2:27:52 PM
BLD02-02415 BLD-Footing10/29/200210/29/200210/29/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/29/2002 at 10:29:05. Contact: ###-####.wip. 10/29/2002 4:20:28 PM
BLD02-01686 BLD-Framing/Rough-in10/29/200210/29/200210/29/2002 12:00:00 AMPPART
###-####. went over rear wall hds requirements with engineer, they are now in place, this plan is very confused, and should have been sent back and resubmitted correctyly so that foundation contractor could have installed hds with no confusion. I have spent over an hour here today as well as prior inspections. Also house papered with out approvals. 10/29/2002 4:41:54 PM
MEC02-01910 Final10/29/200210/29/200210/29/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/29/2002 at 10:59:16. Contact: ###-####. CODE 6449