MIS02-00273
| BLD-Conference | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | | CANC |
|
|
DOING ROOF WITHOUT A BLD PERMIT. BACK ON 5/06/02 THERE WAS A PERMIT TAKEN OUT FOR REHAB MIS02-00115 IF ANY QUESTIONS CALL ME ANNETTE> Out of time today set this back up for tomorow. 10/29/2002 4:42:30 PM
|
BLD02-02337
| BLD-Wall cover | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 10:31:06. Contact: ###-####.posted c/n. 10/29/2002 1:56:01 PM
|
BLD02-02003
| BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PASS |
|
|
###-#### 10/28/2002 12:22:40 PM. Ok to side Talked with framer about shear requirements in the UBC, as he does most work out of town and this inspection is not required also explained the process of getting all trades approved prior to an interior frame inspection. 10/29/2002 10:19:34 AM
|
BLD02-01851
| BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PART |
|
|
###-####. still makeing repairs. 10/29/2002 2:27:29 PM
|
BLD02-01294
| BLD-Final | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 19:12:00. Contact: ###-####.posted c/n. 10/29/2002 10:51:45 AM
|
MEC01-03448
| Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 08:26:49. Contact: ###-####.posted c/n needs a trim colar at attic ceiling line at flue pipe. 10/29/2002 1:52:38 PM
|
BLD02-01461
| BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PART |
|
|
###-####still makeing rwepairs. 10/29/2002 2:27:52 PM
|
BLD02-02415
| BLD-Footing | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 10:29:05. Contact: ###-####.wip. 10/29/2002 4:20:28 PM
|
BLD02-01686
| BLD-Framing/Rough-in | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PART |
|
|
###-####. went over rear wall hds requirements with engineer, they are now in place, this plan is very confused, and should have been sent back and resubmitted correctyly so that foundation contractor could have installed hds with no confusion. I have spent over an hour here today as well as prior inspections. Also house papered with out approvals. 10/29/2002 4:41:54 PM
|
MEC02-01910
| Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 10:59:16. Contact: ###-####. CODE 6449
|