ESC02-00366
| Site Preparation | 10/24/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PART |
|
|
Street trackout cleaned up--waste containers in place--no provisions in place for future trackout during wet conditions--will re-inspect. 10/29/2002 1:23:14 PM
|
ESC02-00367
| Site Preparation | 10/24/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PART |
|
|
Street trackout cleaned up-waste containers in place--no provisions in place to prevent future trackout in wet conditions--will re-inspect. 10/29/2002 1:24:02 PM
|
ESC02-00592
| Site Preparation | 10/24/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | A | PASS |
|
|
|
ESC02-00339
| Site Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | CANC |
|
|
already finaled. 10/29/2002 12:13:59 PM
|
ESC02-00459
| Site Final | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | CANC |
|
|
Already been finaled. 10/29/2002 9:14:24 AM
|
ESC02-00544
| Site Preparation | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | DONE |
|
|
Concrete contractor on site to start work--will re-inspect on thrusday. 10/29/2002 3:56:02 PM
|
ESC02-00187
| Site Preparation | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | DONE |
|
|
Site looks ok 10/29/2002 3:49:20 PM
|
ESC02-00512
| Site Preparation | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | FAIL |
|
|
C/N--posted on site--Concrete backfilling activities around concrete--excessive dirt on sidewalks and street--port-a-pot on sidewalk--need bmp to prevent pollutants from entering drop inlet. 10/29/2002 3:54:45 PM
|
ESC02-00363
| Site Preparation | 10/29/2002 | 10/29/2002 | 10/29/2002 12:00:00 AM | P | FAIL |
|
|
C/n issued and telephoned builder B. Davis 10/29/2002 4:01:42 PM
|