FIR03-00627
| INSP-Supply line flush | 10/28/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | PART |
|
|
Underground sprinkler supply is OK to cover 10/29/2003 11:45:39 AM
|
FIR03-00609
| INSP-Final Inspection | 10/28/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/28/2003 at 11:58:36 AM. Contact: ###-####.
|
FIR03-00589
| INSP-Final Inspection | 10/28/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/28/2003 at 12:00:26 PM. Contact: ###-####.
|
FIR03-00622
| INSP-Sprinkler Rough-in | 10/28/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | FAIL |
|
|
see approved plans for locations where hanagers exceed 9" from sprinkler drop, see plans for location where two drops are supplied from the same 1" outlet 10/29/2003 11:51:42 AM
|
BLD03-02028
| FIRE-Final Inspection | 10/28/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | FAIL |
|
|
provide annual inspection for all existing fire extinguishers, provide fire extinguisher within 75 feet of the furthest new offices 10/29/2003 11:43:21 AM
|
FIR03-00531
| INSP-Final Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | A | PASS |
|
|
|
BLD02-01065
| FIRE-Final Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 10/29/2003 3:48:31 PM
|
BLD03-01675
| FIRE-Final Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | P | PASS |
|
|
fire life safety finaled 10/29/2003 3:48:41 PM
|
FIR02-00226
| INSP-Final Inspection | 10/29/2003 | 10/29/2003 | 10/29/2003 12:00:00 AM | P | FAIL |
|
|
this is patricks cell; Phone #: ###-#### Provide map at the FACP, verify calcs, verify the spot type smoke detectors will work as installed in the return plenums. 10/29/2003 3:14:31 PM
|