Inspections for the day of: Friday, October 29, 2004.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC04-00951 Site Preparation10/27/200410/29/200410/29/2004 12:00:00 AMAPASS
site looks good, BMP's are in place, will follow up.

Received 48-Hour Notice to start construction on 10/27/04 11/1/2004 9:42:58 AM
ESC03-00609 BMP Violation10/28/200410/29/200410/29/2004 12:00:00 AMAPASS
gravel bags have been replaced and sediment has been cleaned out. will follow up. 10/29/2004 8:54:50 AM
ESC04-00371 BMP Violation10/28/200410/29/200410/29/2004 12:00:00 AMAPASS
BMP's have been installed, stop work lifted. will follow up. 10/29/2004 8:55:35 AM
ESC04-01052 BMP Violation10/28/200410/29/200410/29/2004 12:00:00 AMAPASS
BMP's have been installed, stop work has been lifted. will follow up. 10/29/2004 8:56:16 AM
ESC03-01557 BMP Violation10/28/200410/29/200410/29/2004 12:00:00 AMADONE
ESC03-01278 Site Preparation10/28/200410/29/200410/29/2004 12:00:00 AMPPASS
site looks fine, track out has been cleaned up and is being maintained. will follow up. 10/29/2004 9:19:18 AM