Inspections for the day of: Monday, October 29, 2007.
Number of inspections: 13
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00694 INSP-Conference10/19/200710/22/2007 A 
PIV issue
FIR07-00401 FIR-Aging Inspection10/29/200710/29/200711/2/2007 4:10:22 PM DEFR
Under construction.
FIR07-00774 INSP-Final Inspection10/23/200710/29/200710/30/2007 9:27:43 AMPFAIL
Approved plans must be on site for review and field verification of work completed.
FIR07-00344 INSP-Final Inspection10/23/200710/29/200710/30/2007 9:26:13 AMPFAIL
Contractor was not ready for final inspection at the agreed time, both dry systems were off line with control valves shut, air supply lines shut, missing valve trim at both systems including drain line for the pressure switch, automatic ball drips, plugs at the 3-way air guage valves, low air switches were not set. No pre-testing or system check had been completed prior to scheduling a final acceptance test. Although the inspection failed, agreed to make a same day return trip if corrections could be made in time.
FIR06-00504 INSP-Sprinkler Rough-in10/26/200710/29/200710/29/2007 4:20:55 PMPPART
Begin 24 hr. air test for the dry system at 45 psig. at 3:45 pm.
FIR07-00204 INSP-Final Inspection10/29/200710/29/200710/29/2007 3:14:02 PMPPASS
Fire sprinkler final inspection passed per site visit completed by K. Roule, permit finaled.
FIR07-00305 INSP-Final Inspection10/29/200710/29/200710/29/2007 3:12:43 PMPFAIL
See inspection comments per K. Roule including HVAC duct detection and fire damper issues.
BLD07-01982 FIRE-Final Inspection10/29/200710/29/200710/29/2007 3:11:07 PMPPASS
Life safety inspeciton passed, the provided PFE to be attatched to the wall as discussed prior to structural final as agreed.
FIR07-00698 INSP-Final Inspection10/24/200710/29/200710/29/2007 3:09:20 PMPPASS
Fire alarm permit passed final inspection, as-builts accepted.
BLD07-01648 FIRE-Final Inspection10/26/200710/29/200710/29/2007 3:08:03 PMAPASS
Items on correction notice verified for completion, one exit sign repaired while on site, fire life safety finaled.
BLD07-01744 FIRE-Final Inspection10/26/200710/29/200710/29/2007 3:01:22 PMAPASS
Corrections are finished, fire life safety inspection passed.
FIR06-00540 INSP-Sprinkler Rough-in/Hydro10/26/200710/29/200710/29/2007 3:00:04 PMAPART
Hydrostatic test for the 3rd floor NE quad passed, OH rough-in is also acceptable pending repair of beam fireproofing at noted locations where it has been removed to install branch line hangers, also noted field modifications to floorplan layout to be documented on as-built plans.
BLD06-02598 FIRE-Final Inspection10/29/200710/29/200710/29/2007 2:52:52 PMPPASS
C/N is complete, fire life safety inspection passed.