FIR07-00694
| INSP-Conference | 10/19/2007 | 10/22/2007 | | A | |
|
|
PIV issue
|
FIR07-00401
| FIR-Aging Inspection | 10/29/2007 | 10/29/2007 | 11/2/2007 4:10:22 PM | | DEFR |
|
|
Under construction.
|
FIR07-00774
| INSP-Final Inspection | 10/23/2007 | 10/29/2007 | 10/30/2007 9:27:43 AM | P | FAIL |
|
|
Approved plans must be on site for review and field verification of work completed.
|
FIR07-00344
| INSP-Final Inspection | 10/23/2007 | 10/29/2007 | 10/30/2007 9:26:13 AM | P | FAIL |
|
|
Contractor was not ready for final inspection at the agreed time, both dry systems were off line with control valves shut, air supply lines shut, missing valve trim at both systems including drain line for the pressure switch, automatic ball drips, plugs at the 3-way air guage valves, low air switches were not set. No pre-testing or system check had been completed prior to scheduling a final acceptance test. Although the inspection failed, agreed to make a same day return trip if corrections could be made in time.
|
FIR06-00504
| INSP-Sprinkler Rough-in | 10/26/2007 | 10/29/2007 | 10/29/2007 4:20:55 PM | P | PART |
|
|
Begin 24 hr. air test for the dry system at 45 psig. at 3:45 pm.
|
FIR07-00204
| INSP-Final Inspection | 10/29/2007 | 10/29/2007 | 10/29/2007 3:14:02 PM | P | PASS |
|
|
Fire sprinkler final inspection passed per site visit completed by K. Roule, permit finaled.
|
FIR07-00305
| INSP-Final Inspection | 10/29/2007 | 10/29/2007 | 10/29/2007 3:12:43 PM | P | FAIL |
|
|
See inspection comments per K. Roule including HVAC duct detection and fire damper issues.
|
BLD07-01982
| FIRE-Final Inspection | 10/29/2007 | 10/29/2007 | 10/29/2007 3:11:07 PM | P | PASS |
|
|
Life safety inspeciton passed, the provided PFE to be attatched to the wall as discussed prior to structural final as agreed.
|
FIR07-00698
| INSP-Final Inspection | 10/24/2007 | 10/29/2007 | 10/29/2007 3:09:20 PM | P | PASS |
|
|
Fire alarm permit passed final inspection, as-builts accepted.
|
BLD07-01648
| FIRE-Final Inspection | 10/26/2007 | 10/29/2007 | 10/29/2007 3:08:03 PM | A | PASS |
|
|
Items on correction notice verified for completion, one exit sign repaired while on site, fire life safety finaled.
|
BLD07-01744
| FIRE-Final Inspection | 10/26/2007 | 10/29/2007 | 10/29/2007 3:01:22 PM | A | PASS |
|
|
Corrections are finished, fire life safety inspection passed.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 10/26/2007 | 10/29/2007 | 10/29/2007 3:00:04 PM | A | PART |
|
|
Hydrostatic test for the 3rd floor NE quad passed, OH rough-in is also acceptable pending repair of beam fireproofing at noted locations where it has been removed to install branch line hangers, also noted field modifications to floorplan layout to be documented on as-built plans.
|
BLD06-02598
| FIRE-Final Inspection | 10/29/2007 | 10/29/2007 | 10/29/2007 2:52:52 PM | P | PASS |
|
|
C/N is complete, fire life safety inspection passed.
|