MIS08-00146
| BLD-Conference | 10/28/2008 | 10/29/2008 | 10/31/2008 9:36:20 AM | P | NH |
|
|
Brad 602 ###-#### Check for Bldg permit for interior work. Did not return my phone call
|
BLD08-01128
| BLD-Final | 10/28/2008 | 10/29/2008 | 10/30/2008 8:04:51 AM | P | CANC |
|
|
The drinking fountains are installed at this location and we are ready for final inspection/C of O. The official drawings are in the back room rolled up on the computer cart.
Ryan Phone #: ###-#### Internet Inspection Request from: Ryan Skeesuck Re- Sched
|
BLD07-03229
| BLD-Final | 10/29/2008 | 10/29/2008 | 10/29/2008 2:20:16 PM | P | NR |
|
|
John ###-####
|
BLD06-02323
| BLD-Wall cover | 10/29/2008 | 10/29/2008 | 10/29/2008 12:09:31 PM | P | PASS |
|
|
Inspect the 2nd floor of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD08-01625
| BLD-Final | 10/27/2008 | 10/29/2008 | 10/29/2008 10:04:26 AM | A | PASS |
|
|
michael Phone #: ###-#### C/C issued
|
BLD08-01625
| DOC - Permit Finaled | 10/29/2008 | 10/29/2008 | 10/29/2008 10:03:50 AM | P | PASS |
|
|
|
ESC08-00852
| Site Preparation | 10/29/2008 | 10/29/2008 | 10/29/2008 9:20:39 AM | A | PASS |
|
|
|
BLD08-02148
| BLD-Footing | 10/28/2008 | 10/29/2008 | 10/29/2008 9:20:21 AM | A | PASS |
|
|
dave Phone #: ###-####
|
ESC08-00355
| Site Final | 10/29/2008 | 10/29/2008 | 10/29/2008 9:18:33 AM | A | PASS |
|
|
Robert
|
BLD08-00872
| DOC - Permit Finaled | 10/29/2008 | 10/29/2008 | 10/29/2008 9:16:49 AM | A | PASS |
|
|
|
MIS08-00146
| Set Bond Amount | 10/27/2008 | 10/29/2008 | 10/28/2008 8:25:16 AM | P | CANC |
|
|
Check with Brad....###-####
|