Inspections for the day of: Thursday, October 29, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00457 Random Inspection10/29/200910/29/200910/29/2009 1:51:41 PMPCANC
Duplicate.
ESC08-00457 Random Inspection10/29/200910/29/200910/29/2009 1:50:41 PMPFAIL
Verbal to RP:
Make sure that no tracking occurs from the field area where access is established. Also fill out the ESC sign with all of the proper information. WIll re-inspect on 11/2/09PM.
ESC09-00104 Site Preparation10/29/200910/29/200910/29/2009 1:46:05 PMPFAIL
Verbal to RP:
Re-install sediment barrier along the north east corner of site where there is no sediement barrier protection on the stockpile. Clean up all hard surfaces of all sediment and debris. Post ESC sign visable from the street area at the exit of project. Will re-inspect on 10/30/09PM.
ESC09-00203 Tracking Control10/29/200910/29/200910/29/2009 9:47:09 AMAFAIL
Verbal to RP:
Clean up all tracking onto the street from the construction exit. Maintain construction exit to miniumize tacking off of construction project. Will re-inspect on 10/30/09 AM.
ESC07-01236 DOC - Permit Finaled10/29/200910/29/200910/29/2009 8:55:33 AMPPASS
ESC09-00663 Site Final10/29/200910/29/200910/29/2009 8:39:57 AMPPASS
ESC09-00673 Site Preparation10/29/200910/29/200910/29/2009 8:32:19 AM PASS
Waiting on a completion date to finalize permit.