FIR13-00191
| INSP-Final Inspection | 10/28/2013 | 10/29/2013 | 10/30/2013 3:13:44 PM | P | FAIL |
|
|
See the city approved plans for location of devices tested and locations of corrections/additions needed. Per Lee the beams meet the chapter 17 exception and the smoke detector layout is acceptable as installed.
|
FIR12-00414
| INSP-Final Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 3:21:29 PM | P | PASS |
|
|
permit finaled
|
FIR13-00456
| INSP-Alarm Testing | 10/29/2013 | 10/29/2013 | 10/29/2013 11:59:01 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00717
| INSP-Sprinkler Rough-in | 10/28/2013 | 10/29/2013 | 10/29/2013 10:07:16 AM | A | PASS |
|
|
Piping above the restrooms can be covered.
|