ESC13-00259
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 2:14:27 PM | | PASS |
|
|
Sudvision development in progress. Some individual sites have began. BMPs implemented and no track out to main part of Millet. The silt fence at east in by sign needs to be trenched in, but after storm yesterday site conditions are approved.
|
ESC13-01023
| Site Preparation | 10/29/2013 | 10/29/2013 | 10/29/2013 2:00:27 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen.
BMPs installed including perimeter wattles and landscaped strip; permit posted. No corrections at this time. Approved.
|
ESC13-00321
| Tracking Control | 10/29/2013 | 10/29/2013 | 10/29/2013 1:17:34 PM | A | PASS |
|
|
Reinspection of site after call from RP Jason regarding corrections requested. Mud on State Street gutter has been scooped up. No other corrections at this time. Installing perimeter landscaping at time of inspection.
|
ESC13-00321
| Site Preparation | 10/29/2013 | 10/29/2013 | 10/29/2013 11:59:02 AM | P | PASS |
|
|
see activity notes for case, Corrections have been made.
|
ESC13-00126
| Aging Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 11:28:42 AM | | PASS |
|
|
Finaled.
|
ESC13-00126
| DOC - Permit Finaled | 10/29/2013 | 10/29/2013 | 10/29/2013 11:27:51 AM | P | PASS |
|
|
Stockpile has been removed/utilized. Now site has construction of townhome occuring which is covered under ESC13-00716.
|
ESC13-00250
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:51:17 AM | | PASS |
|
|
|
ESC13-00306
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:39:18 AM | | PASS |
|
|
No ESC corrections at this time. No track out, BMPs including DI protection on Woody Lane provided. WIP
|
ESC13-00307
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:38:42 AM | | PASS |
|
|
No ESC corrections at this time. No track out, BMPs including DI protection on Woody Lane provided. WIP
|
ESC13-00305
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:38:10 AM | | PASS |
|
|
No ESC corrections at this time. No track out, BMPs including DI protection on Woody Lane provided. WIP
|
ESC13-00129
| Aging Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:15:49 AM | | PASS |
|
|
No corrections at this time. Permit is posted, work is being conducted in backyard.
|
ESC13-00155
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 10:02:43 AM | | PASS |
|
|
Finaled.
|
ESC13-00155
| DOC - Permit Finaled | 10/29/2013 | 10/29/2013 | 10/29/2013 10:02:07 AM | P | PASS |
|
|
Project complete and stabilized. All other permits Finaled. No further ESC inspections required.
|
ESC13-00967
| BMP Violation | 10/28/2013 | 10/29/2013 | 10/29/2013 9:36:13 AM | A | PASS |
|
|
follow-up inspection. check wattles, construction entrances, and drop inlet protection.
Wattles installed on East side of site. 2 construction entrances, street sweeping, and inlet protection on MS4; called RP to notify corrections are approved. Met site supervisor Ron Dines on site to discuss ESC requirements. Site looks very good today
|
ESC12-00909
| General Inspection | 10/29/2013 | 10/29/2013 | 10/29/2013 8:51:43 AM | | PASS |
|
|
|