FIR14-00344
| INSP-Sprinkler Rough-in | 10/28/2014 | 10/29/2014 | 10/30/2014 5:35:40 PM | P | PART |
|
|
Inspection for the wet system building A 2nd floor completed for units A201 and A202. Insufficient tenting at two locations revised while on site, noted field mods at unit A202- DSW head feed repiped.
|
FIR14-00604
| INSP-Sprinkler Rough-in | 10/28/2014 | 10/29/2014 | 10/30/2014 5:32:06 PM | P | FAIL |
|
|
Inspection for Building A second floor dry system completed 10/29 PM did not pass due to several items related to coverage, spacing, and seismic bracing.
|
BLD14-03180
| FIRE-Final Inspection | 10/27/2014 | 10/29/2014 | 10/29/2014 2:45:31 PM | P | PASS |
|
|
Fire life safety inspection passed per conditions of the permit. Temp occupancy only- expires 12/31/14.
|
BLD13-01571
| FIRE-Final Inspection | 10/28/2014 | 10/29/2014 | 10/29/2014 2:43:56 PM | A | PART |
|
|
Fire life safety final pending conditions to be met per IMC 2009 607.3.3.2. (1).
|
BLD14-02329
| FIRE-Conference | 10/29/2014 | 10/29/2014 | 10/29/2014 2:29:20 PM | P | DONE |
|
|
On site conference regarding fire protection at the mechanical room, trade related fire alarm work, life safety inspection items, project schedule, etc.
|
BLD14-02882
| FIRE-Final Inspection | 10/28/2014 | 10/29/2014 | 10/29/2014 11:03:07 AM | A | PASS |
|
|
Life safety inspection passed.
|
BLD14-02981
| FIRE-Final Inspection | 10/28/2014 | 10/29/2014 | 10/29/2014 10:39:28 AM | A | PASS |
|
|
Previous C/N items completed. Fire life safety passed.
|
BLD14-02790
| FIRE-Final Inspection | 10/28/2014 | 10/29/2014 | 10/29/2014 10:33:29 AM | A | PASS |
|
|
Fire life safety okay for final pending tenant space building address numbers are posted and signage at the door to the new fire riser room is provided. *NOTE- existing fire sprinkler system is due annual certification and inspection 10/30/14.
|