Inspections for the day of: Thursday, October 29, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GRD15-00028 FIRE-Final Inspection10/29/201510/29/201511/4/2015 8:54:30 AMPPASS
Pass per Scott Arellano
BLD15-02733 FIRE-Final Inspection10/29/201510/29/201510/29/2015 3:45:16 PMPFAIL
Repair the emergency lights on the west side of store
BLD15-02064 FIRE-Final Inspection10/29/201510/29/201510/29/2015 3:27:12 PMPPASS
Life safety passed
NAF15-00014 INSP-Alarm Testing10/29/201510/29/201510/29/2015 3:26:03 PMPDONE
No actual testing was performed. I did a walk through of the remaining building which included the 1st, 2nd and 3rd floors. I marked on the city approved plans locations of deficiencies which included overspaced smoke detectors in all of the main corridors, one strobe in a corridor that needs to be relocated due to an obstruction and multiple smoke detectors in the apartments that are located less than 3'-0" from bathrooms with tubes/showers. I also verified with Jim Page that as per Katie's previous entry the 2nd and 3rd floor recall still needs to be performed as well as the actual flowing of water for the flow switch testing.
FIR15-00303 INSP-Sprinkler Rough-in/Hydro10/29/201510/29/201510/29/2015 11:46:31 AMPPASS
Overhead hydro test passed
BLD15-00981 FIRE-Final Inspection10/29/201510/29/201510/29/2015 11:45:09 AMPCANC
Jerry and I discussed requirements for the life safety.
FIR15-00479 INSP-Final Inspection10/27/201510/29/201510/29/2015 11:43:55 AMPPASS
permit finaled
BLD15-01983 FIRE-Final Inspection10/28/201510/29/201510/29/2015 12:00:00 AMPCANC
Mike Phone #: ###-####
FIR15-00723 INSP-Final Inspection10/28/201510/29/201510/28/2015 12:51:37 PMAPASS
Permit finaled