GRD15-00028
| FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 11/4/2015 8:54:30 AM | P | PASS |
|
|
Pass per Scott Arellano
|
BLD15-02733
| FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 3:45:16 PM | P | FAIL |
|
|
Repair the emergency lights on the west side of store
|
BLD15-02064
| FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 3:27:12 PM | P | PASS |
|
|
Life safety passed
|
NAF15-00014
| INSP-Alarm Testing | 10/29/2015 | 10/29/2015 | 10/29/2015 3:26:03 PM | P | DONE |
|
|
No actual testing was performed. I did a walk through of the remaining building which included the 1st, 2nd and 3rd floors. I marked on the city approved plans locations of deficiencies which included overspaced smoke detectors in all of the main corridors, one strobe in a corridor that needs to be relocated due to an obstruction and multiple smoke detectors in the apartments that are located less than 3'-0" from bathrooms with tubes/showers. I also verified with Jim Page that as per Katie's previous entry the 2nd and 3rd floor recall still needs to be performed as well as the actual flowing of water for the flow switch testing.
|
FIR15-00303
| INSP-Sprinkler Rough-in/Hydro | 10/29/2015 | 10/29/2015 | 10/29/2015 11:46:31 AM | P | PASS |
|
|
Overhead hydro test passed
|
BLD15-00981
| FIRE-Final Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 11:45:09 AM | P | CANC |
|
|
Jerry and I discussed requirements for the life safety.
|
FIR15-00479
| INSP-Final Inspection | 10/27/2015 | 10/29/2015 | 10/29/2015 11:43:55 AM | P | PASS |
|
|
permit finaled
|
BLD15-01983
| FIRE-Final Inspection | 10/28/2015 | 10/29/2015 | 10/29/2015 12:00:00 AM | P | CANC |
|
|
Mike Phone #: ###-####
|
FIR15-00723
| INSP-Final Inspection | 10/28/2015 | 10/29/2015 | 10/28/2015 12:51:37 PM | A | PASS |
|
|
Permit finaled
|