ESC15-00503
| Aging Inspection | 10/29/2015 | 10/29/2015 | 10/30/2015 2:01:22 PM | | CANC |
|
|
|
ESC13-01323
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 3:52:03 PM | | PASS |
|
|
Construction complete. Some minor landscaping and site work is ongoing at the west end of Cantabria. All individual unit ESC permits finaled.
Correction: - remove DI bags on Overland and Cloverdale - stabilized boundary/interface with canal easement - remove silt fence.
|
ESC14-00432
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 3:49:02 PM | | PASS |
|
|
No subdivision activity. WIP on SFHs by Hayden Homes, permitted seperately. No corrections
|
ESC13-01159
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 3:18:33 PM | | CANC |
|
|
rescheduled for Monday 11/2
|
ESC15-00512
| Site Final | 10/29/2015 | 10/29/2015 | 10/29/2015 3:17:11 PM | P | PASS |
|
|
Pool installed. Permit conditions satisfied. ESC conditions and corrections for Cantabria are listed under ESC13-01323
|
ESC15-00094
| Random Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 2:33:51 PM | P | PASS |
|
|
No issues at site, no discharges, sediment/mud blowouts to roadways, or other issues. The slopes in Boulder Heights #6 were hydroseeded on Tuesday 10/27. Wattles are installed on long slopes to treat sheet flow for sediment.
Stockpile of topsoil on Echo is still there, will continue to check with Gossett landscaping project for removal and cleanup of culdesac.
|
ESC15-01091
| Site Preparation | 10/29/2015 | 10/29/2015 | 10/29/2015 2:11:22 PM | P | PASS |
|
|
Permit sign posted. Wattles installed at toe of slope on lot and sidewalk boundary. Approved for excavation. WIP.
|
ESC15-01175
| Site Preparation | 10/29/2015 | 10/29/2015 | 10/29/2015 12:19:42 PM | P | PEND |
|
|
RP for project will be Carl Benjamin - ###-####
Correction request:
-Need to post yellow ESC sign and install 2x DI bags by end of day.
Construction entrance will be rumble bar once the existing asphalp is removed. Requested to clean up any trackout or mud in the gutter.
|
ESC14-00299
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 12:02:11 PM | | PART |
|
|
WIP. Silt fence installed at bottom of slope has contained sediment. Landscaping rock is being installed currently.
Correction: - clean up milky liquid collected in gutter in front of home and contain wallboard pile to prevent it being broken and mixed with stormwater.
|
ESC14-00438
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 11:33:50 AM | | PASS |
|
|
Yard and slopes have now been stabilized with a hydroseed mulch. Coverage looks very good, no sediment leaving site and no evidence of erosion rills developing. No further ESC inspection, conditions satisfied.
|
ESC15-00581
| Site Preparation | 10/28/2015 | 10/29/2015 | 10/29/2015 11:33:50 AM | A | PASS |
|
|
Jamal Phone #: ###-####
Walk through with hotel representative and RP for lobby canopy renovations. MS4 stormdrain of Sunrise Rim has sediment filter bag installed. Area of work on hotel grounds has been surrounded with construction fencing with permit signs posted. Trash containers have been placed on site for demolished/discarded materials. Onsite stormwater infiltration pit has has had inlets protected. RP familiar with ESC permit conditions. Approved. to start construction.
|
ESC14-00438
| DOC - Permit Finaled | 10/29/2015 | 10/29/2015 | 10/29/2015 11:32:14 AM | P | PASS |
|
|
|
ESC13-00655
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 10:12:46 AM | | PASS |
|
|
No further construction. Residents have moved into all new buildings of phase II of Aberdeen Square. Entire subdivision is now built out. Construction equipment, materials and dumpsters removed. No loose sediment or dirt stockpiles.
No immediate stormwater issues, but correction request to remove temp DI bags was issued to Biltmore Company. Will check for Final next general inspection.
|
ESC14-01011
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 9:29:45 AM | | PASS |
|
|
WIP. Clean site. No erosion or runoff issues observed.
|
ESC14-00759
| General Inspection | 10/29/2015 | 10/29/2015 | 10/29/2015 8:53:42 AM | | PASS |
|
|
Hillside revegetation in progress....no erosion issues or sediment running off site.
|