BLD01-02523
| BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
ft insp- jr-- ###-####...bsmt perim ftgs only... #4 bar dowels @ 16" oc for wall to be placed...ok to wet set, hooks in forms. 10/3/2001 10:41:42 AM
|
BLD99-03148
| BLD-Final | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | NR |
|
|
###-####, need fire ok, consultants report re flue/chimnney & walk thru 10/3/2001 11:14:19 AM
|
BLD01-00186
| BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/3/2001 11:12:07 AM keep c/n(s)...ext ok to place veneer
|
BLD01-02425
| BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
ben ###-#### perim ftgs ok, need 2 sections nt shear wall footings to have bar added (as per simpson) 10/3/2001 10:24:56 AM
|
BLD01-01643
| BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
###-####, elev pit base & walls 10/3/2001 3:07:30 PM
|
BLD01-01643
| BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
2nd fl. int partitions except chases ok 10/3/2001 3:08:26 PM
|
BLD01-01634
| BLD-Concrete | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/3/2001 3:06:51 PM col ftgs at rear of bldg ok
|
BLD01-00531
| BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/3/2001 5:40:48 PM 2nd fl ins ok, sec 1
|
BLD01-01634
| BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/3/2001 5:46:12 PM seismic straps,blocks ok...bolts imbeds ok per mti
|
BLD01-00531
| BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
scott-- ###-#### energy code 1st fl, sec 1 10/3/2001 11:15:14 AM
|
BLD01-00531
| BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 10/3/2001 8:52:14 AM reinsp Scott ###-#### 1st/2nd fls sec 1ok to begin cover...drywall/firestop insp req'd 10/3/2001 5:39:24 PM c/n re 2hr walls at loft areas (4th fl.) 10/3/2001 5:41:34 PM
|
BLD01-01248
| BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | NR |
|
|
###-#### need elec. 10/3/2001 5:43:03 PM
|