PLM01-03387
| Sprinkler (Final) | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
monte- ###-####
|
PLM01-03388
| Sprinkler (Final) | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | FAIL |
|
|
monte-- ###-#### move shut off and drain valves inside property line. called contractor 10/3/2001 10:35:49 AM
|
PLM01-03342
| Final | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
###-#### ROB this inspection is for a plumbing rough-in 10/3/2001 4:29:33 PM
|
PLM01-03302
| Groundwork | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-03384
| Plumbing Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01218
| Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 360 On 10/3/2001 11:04:35 AM
|
PLM01-03292
| Plumbing Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
r/i ###-#### budda
|
PLM01-01860
| Final | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:58:19. Contact: ###-####. need backflow devices tested and certified need hose bib vacume breaker on boiler drain under fountain called left message 10/3/2001 2:39:25 PM
|
PLM01-03392
| Sprinkler (Final) | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
backflow shandee ###-####
|
PLM01-03386
| Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
###-####- paul fn
|
PLM01-02736
| Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 09:36:38. Contact: ###-####.
|