BLD01-01603
| BLD-Aging Inspection | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | | PART |
|
|
wip last inso 8-3-01 10/3/2001 8:26:26 AM
|
BLD01-00460
| BLD-Framing/Rough-in | 9/26/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 408 On 9/26/2001 8:34:05 AM wip 10/3/2001 8:37:23 AM
|
BLD00-02277
| BLD-Wall cover | 10/1/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 14:47:09. Contact: ###-####. needs studs replaced or other on third floor 10/3/2001 12:04:14 PM
|
BLD00-03081
| BLD-Final | 10/1/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 14:48:32. Contact: ###-####. ok for temp 10/3/2001 11:55:34 AM
|
BLD01-00361
| BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 09:44:13. Contact: ###-####. shear nailing ok grout pour ok wip 10/3/2001 10:26:17 AM
|
BLD01-01885
| BLD-Footing | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:19:54. Contact: ###-####. spec insp needed on steel 10/3/2001 1:51:42 PM
|
BLD01-01885
| BLD-Foundation | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:21:33. Contact: ###-####. spec insp needed on steel 10/3/2001 1:52:00 PM
|
BLD00-03080
| BLD-Wall cover | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 09:23:58. Contact: ###-####.
|
BLD01-00793
| BLD-Foundation | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
###-####- frank found
|
BLD01-00793
| BLD-Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 408 On 10/3/2001 2:18:32 PM ok for final after others sign final
|