MEC01-02909
| Pressure Test | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 15:37:15. Contact: ###-####. the gage is at the range. gas pipe undersized...need full 1" to furn/wh 10/3/2001 10:23:14 AM
|
MEC01-02780
| Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 16:57:14. Contact: ###-####....45--e7 10/3/2001 8:42:03 AM...between cole and maple grove off overland to vinnell 10/3/2001 8:46:54 AM...after inspection i found out this is in the county 10/3/2001 9:34:26 AM
|
MEC01-02780
| Pressure Test | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 16:57:29. Contact: ###-####.
|
MEC01-02655
| Final | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:43:54. Contact: ###-####.
|
MEC01-02656
| Final | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 12:44:22. Contact: ###-####....69--d4 10/3/2001 8:43:32 AM
|
MEC01-02943
| Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
fireplace also ###-####
|
MEC01-02943
| Pressure Test | 10/2/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
|
MEC01-02945
| Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
8th and brumbach 10/3/2001 12:56:13 PM gas ok also 10/3/2001 2:58:50 PM
|
MEC01-02951
| Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
fn --ed ###-#### cell--call 1st before insp
|
MEC01-02871
| Pressure Test | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | PASS |
|
|
re-insp pre test -joe- cell ###-#### gc --call 1st before insp
|
MEC01-02230
| Final | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | FAIL |
|
|
fn jerry ###-####--gar door code is 7550 for access complete dryer term...reg to vent outside 10/3/2001 3:17:05 PM
|
MEC01-02909
| Pressure Test | 10/3/2001 | 10/3/2001 | 10/3/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/03/2001 at 10:12:22. Contact: ###-####....###-#### 10/3/2001 3:26:14 PM told brian to test all the line from the meter 10/3/2001 4:30:23 PM
|