Inspections for the day of: Thursday, October 3, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01638 BLD-Footing10/2/200210/3/200210/3/2002 12:00:00 AMAPART
JAY ###-#### Footing poured.....Contr said wrong insp called in (1637)....But Tom A. looked at footing....Should have been bld02-01638. 10/3/2002 10:11:13 AM
BLD02-00672 BLD-Final10/2/200210/3/200210/3/2002 12:00:00 AMAFAIL
0071 garage code; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung C/N posted. 10/3/2002 11:05:00 AM
MEC02-01385 Final10/2/200210/3/200210/3/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
MEC02-01386 Final10/2/200210/3/200210/3/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
MEC02-01387 Final10/2/200210/3/200210/3/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
MEC02-01388 Final10/2/200210/3/200210/3/2002 12:00:00 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-02433 BLD-Final10/2/200210/3/200210/3/2002 12:00:00 AMAPART
###-#### or ###-#### ralph milstead Talked to owner about placement of bldg. 10/3/2002 11:31:09 AM
BLD02-02280 BLD-Footing10/3/200210/3/200210/3/2002 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01994 BLD-Wall cover10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/03/2002 at 08:34:02. Contact: ###-####. Shear ok 10/3/2002 2:53:49 PM
BLD02-02208 BLD-Framing/Rough-in10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
###-####
BLD02-02379 BLD-Footing10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
GARY- ###-####
BLD02-00290 BLD-Final10/3/200210/3/200210/3/2002 12:00:00 AMPFAIL
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Called contact #......Verbal....Need HVAC and Electr final before calling for struct final. 10/3/2002 1:06:39 PM
BLD02-01638 BLD-Foundation10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01639 BLD-Footing10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01635 BLD-Footing10/3/200210/3/200210/3/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung