PLM02-02941
| Groundwork | 10/2/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | A | PASS |
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
PLM02-02275
| Final | 10/2/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 14:55:32. Contact: ###-####.
|
PLM02-01868
| Final | 10/2/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | A | PASS |
|
|
###-####- david FINAL OK 10/3/2002 9:42:52 AM
|
PLM02-00906
| Roof Drains | 10/2/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2002 at 15:28:14. Contact: ###-####.--area "b" first floor s.e. baggage area to riser by elevator 8" 10/3/2002 2:59:47 PM
|
PLM02-00906
| Plumbing Rough-in | 10/2/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | A | PART |
|
|
for existing concourse--collin- ###-#### waste below floor ok needs to complete water 10/3/2002 3:00:20 PM
|
PLM02-03029
| Plumbing Rough-in | 10/3/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | P | PART |
|
|
###-#### shielded teansition coupling required at the c.i.-abs building drain connection, provide a sump in the basement for the t&p drain. ok to cover r/i. 10/3/2002 4:11:23 PM
|
PLM02-02938
| Sprinkler (Final) | 10/3/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | P | PASS |
|
|
###-#### CHAD
|
PLM02-00925
| Final | 10/3/2002 | 10/3/2002 | 10/3/2002 12:00:00 AM | P | NH |
|
|
###-#### they called at 3:30 and said they weren't going to be around any later, resch. for tomarrow am 10/3/2002 3:31:23 PM
|