ELE05-03438
| Electrical Rough-In | 10/3/2005 | 10/3/2005 | 10/3/2005 4:35:38 PM | P | PASS |
|
|
Charlie Internet Inspection Request from: Melyne Davis ric ok, need to change room count to 6 and a/c
|
ELE05-03253
| Electrical Rough-In | 9/30/2005 | 10/3/2005 | 10/3/2005 3:19:12 PM | P | FAIL |
|
|
vivian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left message, left corr notice, 300.4(D) nm cable shall be 1 1/4" from edge of framing members, 210.52(A)(1) recpts shall be spaced so that no point is more than 6' from a recpt outlet, 314.20 boxes in combustible material shall be flush or project therefrom,300.3(C) and 725.55(A) low voltage ckt shall not be run with power ckts,300.4 conductors shall be protected form damage (outside lite boxes)
|
ELE05-03549
| Permanent Service | 9/28/2005 | 10/3/2005 | 10/3/2005 1:35:51 PM | P | PASS |
|
|
mitch ###-#### p/s u/g exst reconnect ok
|
ELE05-03438
| Electrical Rough-In | 9/30/2005 | 10/3/2005 | 10/3/2005 10:44:49 AM | A | NR |
|
|
Charlie Internet Inspection Request from: Melyne Davis called contr, no access
|
ELE05-03407
| Rough-In Permanent Service | 9/30/2005 | 10/3/2005 | 10/3/2005 10:42:21 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 7:51:10 AM. Contact: ###-####. ric ok p/s u/g n ok
|
ELE05-02940
| Final | 9/30/2005 | 10/3/2005 | 10/3/2005 9:45:00 AM | A | PART |
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore called contr, need to see upstairs bath and disposal. Rest ok.
|
ELE05-02893
| Electrical Rough-In | 9/30/2005 | 10/3/2005 | 10/3/2005 9:05:10 AM | A | FAIL |
|
|
this is for a reinspection. any questions please call Chris Hill.; Phone #: ###-#### Internet Inspection Request from: Jeff Radford met gen contr, signed t/o card, called contr, left corr notice, 314.23(C) recpt shall securely mounted to wall ne room and back door, 408.4 panel schedule shall be detailed to distinguish each circuit, fixtures shall be inspected once installed 3 places in front lobby.
|
ELE05-03085
| Final | 9/30/2005 | 10/3/2005 | 10/3/2005 8:41:28 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 2:05:18 PM. Contact: ###-####. ok to final
|
ELE05-03180
| Electrical Rough-In | 9/30/2005 | 10/3/2005 | 10/3/2005 8:21:23 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 9/30/2005 at 2:05:03 PM. ###-####. ok to cover bath walls and column in front area, hall area walls too.
|