FIR05-00405
| INSP-Sprinkler Rough-in | 10/3/2005 | 10/3/2005 | 10/3/2005 4:32:49 PM | P | PART |
|
|
Overhead rough-in is good for cover on the 1st and 2nd floors only, a head is required in the 3rd floor master closet as it exceeds 24 sq ft, need to inspect tenting and insulation on the 3rd floor when installed before cover, heads at furnace/water heater need appropriate temp. rating.
|
BLD04-03049
| FIRE-Final Inspection | 9/30/2005 | 10/3/2005 | 10/3/2005 3:05:39 PM | P | PASS |
|
|
Fire life safety passed inspection.
|
FIR05-00520
| INSP-Final Inspection | 10/3/2005 | 10/3/2005 | 10/3/2005 3:04:32 PM | P | PART |
|
|
Heads and escutcheons have been installed, ready for final when fire pump for water supply and riser are complete.
|
FIR05-00372
| INSP-Sprinkler Rough-in | 10/3/2005 | 10/3/2005 | 10/3/2005 3:02:09 PM | P | FAIL |
|
|
Inspection was for cover at hard lids in the main box office lobby area first floor on sheet FP2. Fail inspection, provide resubmittals for several changes in pipe routing from the approved plans, two heads are 5' apart, one retaining strap is not fastened to the beam, not all heads are cut in.
|