Inspections for the day of: Wednesday, October 3, 2007.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02545 BLD-Energy code compliance10/3/200710/3/200710/3/2007 5:02:00 PMPPASS
august Phone #: ###-####
BLD07-01536 BLD-Framing/Rough-in10/3/200710/3/200710/3/2007 4:31:21 PMPPASS
matt Phone #: ###-####
BLD07-01535 BLD-Framing/Rough-in10/3/200710/3/200710/3/2007 4:30:51 PMPPASS
matt Phone #: ###-####
BLD07-01534 BLD-Framing/Rough-in10/3/200710/3/200710/3/2007 4:30:23 PMPPASS
matt Phone #: ###-####
BLD06-02965 BLD-Final9/28/200710/3/200710/3/2007 4:29:21 PMPPASS
steve Phone #: ###-####
BLD06-02965 DOC - Permit Finaled10/3/200710/3/200710/3/2007 4:28:46 PMPPASS
c of c/o issued
BLD07-02489 BLD-Conference10/3/200710/3/200710/3/2007 4:27:10 PMPPASS
eli Phone #: ###-####
frame conf,, ok notch existing 3 ply header for stair head room
MIS07-00209 BLD-Conference10/3/200710/3/200710/3/2007 2:32:38 PMPFAIL
Received phone call complaint that large deck being contructed without permit //10/3/07 LEG
SWO ISSUED,, Northridge builders,, ###-####,, (sign in front)
BLD07-01747 BLD-Framing/Rough-in10/3/200710/3/200710/3/2007 2:14:37 PMPPART
Scheduled by a contractor via Hello! on 10/3/2007 at 9:06:27 AM. Contact: ###-####., most shear ok,, still some nailing of straps to do
BLD07-00236 BLD-Framing/Rough-in10/2/200710/3/200710/3/2007 12:22:05 PMAPASS
Scheduled by a contractor via Hello! on 10/2/2007 at 11:04:07 PM. Contact: ###-####.
ok to insulate all now
BLD04-02974 BLD-Framing/Rough-in10/2/200710/3/200710/3/2007 11:56:20 AMAPART
tatyana Phone #: ###-####
ok to insulate,, verify 2 bath ducts at e. c.