Inspections for the day of: Wednesday, October 3, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00223 INSP-Final Inspection10/3/200710/3/200710/4/2007 8:13:06 AMPFAIL
Provide orfice in the sprinkler test line and test the flow switch and alarm bell. Flush the underground supply piping. Provide signage at the riser. Provide hydraulic sticker, head box, spare sprinklers and head wrench. Mount the riser against the wall. Provide the missing sprinkler canopies and replace the sprinkler canopies that have been painted unless verification can be provided that they were factory painted.
BLD05-00633 FIRE-Final Inspection10/3/200710/3/200710/4/2007 8:00:15 AMPFAIL
Inspection was to check the operation of the emergency lights and exit signs. We found out that by testing the emergency generator the pharmacy would be shut down which was not going to be acceptable by the st als people so no test was performed.
FIR07-00679 INSP-Final Inspection10/2/200710/3/200710/4/2007 7:50:51 AMAPASS
permit finaled
FIR07-00798 INSP-Alarm Testing10/2/200710/3/200710/4/2007 7:49:32 AMPDONE
Permit is ready to be finaled but needs to ve called in as a final inspection
MIS07-00205 FIR-Final10/3/200710/3/200710/4/2007 7:47:28 AMPFAIL
The exit lights and emergency lights at the west end of the sanctuary are wired into the lighting circuit and can be turned off with the switch. Again this inspection is for the upper floor only.
FIR06-00778 INSP-Final Inspection10/1/200710/3/200710/3/2007 2:45:23 PMACANC
Per Brian there is no access. Permit to be rescheduled
FIR07-00611 INSP-Final Inspection10/1/200710/3/200710/3/2007 12:32:27 PMAPASS
permit finaled
FIR07-00607 INSP-Final Inspection10/1/200710/3/200710/3/2007 12:09:03 PMAPASS
Permit finaled
FIR07-00604 INSP-Final Inspection10/1/200710/3/200710/3/2007 11:01:11 AMAPASS
Permit finaled
FIR06-00911 INSP-Final Inspection10/1/200710/3/200710/3/2007 10:14:44 AMAPASS
Permit finaled
FIR07-00724 INSP-Final Inspection10/2/200710/3/200710/3/2007 10:09:49 AMAPASS
permit finaled
FIR06-00957 INSP-Final Inspection10/2/200710/3/200710/3/2007 8:58:25 AMAPASS
permit finaled
FIR06-00956 INSP-Final Inspection10/2/200710/3/200710/3/2007 8:57:48 AMAPASS
Permit finaled
FIR07-00771 INSP-Sprinkler Rough-in10/1/200710/3/200710/3/2007 8:51:34 AMAPASS
permit finaled
FIR07-00771 INSP-Final Inspection10/1/200710/3/200710/3/2007 8:50:27 AMAPASS
permit finaled