Inspections for the day of: Friday, October 3, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00623 INSP-Sprinkler Rough-in10/3/200810/3/200810/3/2008 4:34:16 PMPPASS
The sprinkler rough-in is ok but the sprinkler piping can not be covered until the insulation that is hanging from the deck and blocking the upright sprinklers has been repaired and verified by an inspection.
FIR08-00531 INSP-Sprinkler Rough-in10/2/200810/3/200810/3/2008 4:32:52 PMAPART
I met John, the job superintendant, on site and gave the approval to cover the main east/west corridor. One upright sprinkler head still has not be centered as per the correction notice. John stated that he would leave an access for me to check this head later. He stated that the fire sprinkler contractor had contacted the city plan review and that they were waiting plans. I looked it up on the computer and could find no record of a resubmittal. John was going to followup with Shilo. The Sanctuary is not approved for cover.
FIR08-00246 INSP-Final Inspection9/30/200810/3/200810/3/2008 4:11:38 PMAPASS
All corrections made per Troys last inspection. KR
BLD06-02059 FIRE-Final Inspection10/2/200810/3/200810/3/2008 12:16:32 PMACANC
To be rescheduled per the contractor.
FIR08-00551 INSP-Sprinkler Rough-in10/2/200810/3/200810/3/2008 12:15:55 PMAPASS
The remaining sprinkler piping is ok to cover where the sprinkler coverage was inadequate due to the roof transitions. I kept one copy of the as-builts to be compared with the city approved plans when received.
BLD07-03079 FIRE-Final Inspection10/2/200810/3/200810/3/2008 10:03:30 AMAPASS
fire safety passed
FIR08-00533 INSP-Final Inspection10/2/200810/3/200810/3/2008 9:50:13 AMAPASS
permit finaled
FIR08-00505 INSP-Final Inspection10/2/200810/3/200810/3/2008 8:50:30 AMAPASS
Permit finaled.