FIR08-00623
| INSP-Sprinkler Rough-in | 10/3/2008 | 10/3/2008 | 10/3/2008 4:34:16 PM | P | PASS |
|
|
The sprinkler rough-in is ok but the sprinkler piping can not be covered until the insulation that is hanging from the deck and blocking the upright sprinklers has been repaired and verified by an inspection.
|
FIR08-00531
| INSP-Sprinkler Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 4:32:52 PM | A | PART |
|
|
I met John, the job superintendant, on site and gave the approval to cover the main east/west corridor. One upright sprinkler head still has not be centered as per the correction notice. John stated that he would leave an access for me to check this head later. He stated that the fire sprinkler contractor had contacted the city plan review and that they were waiting plans. I looked it up on the computer and could find no record of a resubmittal. John was going to followup with Shilo. The Sanctuary is not approved for cover.
|
FIR08-00246
| INSP-Final Inspection | 9/30/2008 | 10/3/2008 | 10/3/2008 4:11:38 PM | A | PASS |
|
|
All corrections made per Troys last inspection. KR
|
BLD06-02059
| FIRE-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 12:16:32 PM | A | CANC |
|
|
To be rescheduled per the contractor.
|
FIR08-00551
| INSP-Sprinkler Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 12:15:55 PM | A | PASS |
|
|
The remaining sprinkler piping is ok to cover where the sprinkler coverage was inadequate due to the roof transitions. I kept one copy of the as-builts to be compared with the city approved plans when received.
|
BLD07-03079
| FIRE-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 10:03:30 AM | A | PASS |
|
|
fire safety passed
|
FIR08-00533
| INSP-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 9:50:13 AM | A | PASS |
|
|
permit finaled
|
FIR08-00505
| INSP-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 8:50:30 AM | A | PASS |
|
|
Permit finaled.
|