BLD08-00777
| BLD-Conference | 10/3/2008 | 10/3/2008 | 10/3/2008 5:00:52 PM | P | DONE |
|
|
Contractor to submit drawing to design review for new roof line.
|
BLD08-00777
| BLD-Final | 10/3/2008 | 10/3/2008 | 10/3/2008 3:30:47 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 10/3/2008 at 10:46:07 AM. Contact: ###-####.
|
ESC08-00757
| Random Inspection | 10/3/2008 | 10/3/2008 | 10/3/2008 2:01:00 PM | P | PASS |
|
|
ESC permit sign posted. Site was clean.
|
BLD08-01922
| BLD-Framing/Rough-in | 10/3/2008 | 10/3/2008 | 10/3/2008 2:00:28 PM | P | PASS |
|
|
john Phone #: ###-####. ok to insul.
|
BLD05-03320
| BLD-Final | 10/2/2008 | 10/3/2008 | 10/3/2008 12:21:55 PM | A | NR |
|
|
dan Phone #: ###-####. Needs zoning sign off. Dan was contacted.
|
ESC07-01595
| Random Inspection | 10/3/2008 | 10/3/2008 | 10/3/2008 12:21:15 PM | A | PASS |
|
|
|
BLD08-01818
| BLD-Conference | 10/2/2008 | 10/3/2008 | 10/3/2008 12:15:31 PM | A | PASS |
|
|
pat mitchell Phone #: ###-####. Footings for bldg. ok. as per plan.
|
BLD07-03278
| BLD-Framing/Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 12:14:43 PM | A | PART |
|
|
South East and East shear wall inspection. Bob Young.will be on site to review. His cell is ###-####. Thanks Phone #: ###-#### Internet Inspection Request from: Gary Beck. Shear nailing ok in this area.
|
ESC08-00651
| General Inspection | 10/3/2008 | 10/3/2008 | 10/3/2008 8:57:48 AM | A | PASS |
|
|
|
BLD08-01619
| BLD-Framing/Rough-in | 10/2/2008 | 10/3/2008 | 10/3/2008 8:57:34 AM | A | FAIL |
|
|
Mark Phone #: ###-####. All items on c/n notice have not been repaired. Contractor was notified.
|