FIR07-00819
| FIR-Aging Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 4:21:02 PM | | DONE |
|
|
|
BLD11-00416
| FIRE-Sprinkler Rough-in | 10/3/2011 | 10/3/2011 | 10/3/2011 4:19:30 PM | P | PART |
|
|
Overhead work okayed for cover with the exception of the first floor corrdior at the new addition.
|
FIR11-00345
| INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 4:17:56 PM | P | FAIL |
|
|
Missing escutcheon at the main level, missing one SW head at a basement bedroom closet, need to secure control valves in the open position at the riser. Outside bell tested okay.
|
FIR11-00466
| INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 3:24:42 PM | P | PART |
|
|
Final pending overhead door modifications for verification of SW head placement. Main re-route okayed.
|
BLD11-01796
| FIRE-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 2:59:06 PM | P | PASS |
|
|
Previous correction notice items verified for completion. Fire life safety finaled.
|
FIR11-00471
| INSP-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 2:11:22 PM | A | PASS |
|
|
Scope of fire sprinkler work completed. Permit finaled.
|
FIR11-00471
| INSP-Sprinkler Rough-in | 10/3/2011 | 10/3/2011 | 10/3/2011 2:08:14 PM | A | PART |
|
|
Overhead rough-in passed.
|
FIR11-00523
| INSP-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 1:51:43 PM | A | PASS |
|
|
Scope of fire sprinkler work completed satisfactory. Permit finaled.
|
BLD11-01793
| FIRE-Conference | 10/3/2011 | 10/3/2011 | 10/3/2011 1:50:17 PM | A | DONE |
|
|
On site meeting with contractor regarding existing fire sprinkler system and tenant alterations.
|
FIR11-00186
| INSP-Alarm Testing | 10/3/2011 | 10/3/2011 | 10/3/2011 1:48:07 PM | A | PART |
|
|
Ref. plans for areas inspected to date.
|