FIR06-00062
| FIR-Aging Inspection | 10/3/2011 | 10/3/2011 | 10/6/2011 8:40:42 AM | | NR |
|
|
I forwarded this permit number and status to scott for further action.
|
FIR11-00379
| INSP-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 3:35:45 PM | P | PASS |
|
|
Permit finaled. The EOL was 2/10 of a volt outside the allowed minimum voltage. Since the panel is going to be replaced in two days it was agreed to allow this temporary condition.
|
FIR11-00529
| INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 2:33:10 PM | P | PASS |
|
|
Permit finaled
|
BLD11-01889
| FIRE-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 2:32:42 PM | P | CANC |
|
|
This permit called in by mistake by the sprinkler contractor.
|
BLD10-02666
| FIRE-Conference | 9/30/2011 | 10/3/2011 | 10/3/2011 2:31:40 PM | A | DONE |
|
|
The insulation filling the combustible concealed spaces has been verified.
|
FIR11-00525
| INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 1:55:11 PM | P | FAIL |
|
|
The overspaced pendant has been corrected. Will be able to final when the ceiling tile is installed.
|
BLD11-01961
| FIRE-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 1:43:18 PM | P | PASS |
|
|
life safety passed
|
BLD11-01888
| FIRE-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 9:30:43 AM | A | PASS |
|
|
life safety passed
|
BLD11-01959
| FIRE-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 9:30:19 AM | A | FAIL |
|
|
Need the ceiling tile installed and the project related fire sprinkler permit finaled. All other items are ok.
|
FIR11-00495
| INSP-Final Inspection | 9/30/2011 | 10/3/2011 | 10/3/2011 9:12:21 AM | A | CANC |
|
|
A new corridor wall marked "temporary" on the city approved building plans is going to be more of a permanent wall. Sprinkler protection will need to be added on the west side.
|
FIR11-00436
| INSP-Sprinkler Rough-in | 9/30/2011 | 10/3/2011 | 10/3/2011 9:10:01 AM | A | PART |
|
|
See the city approved plans for the office area marked in red where the sprinkler piping is ok to cover. The "lab" piping was requested for cover but the upright protection for the combustible concealed space above the ceiling has been removed. Uprights will need to be installed prior to an approval for cover given.
|
FIR11-00228
| INSP-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 12:00:00 AM | P | CANC |
|
|
Overbooked.
Rod or Brian #: ###-####
|
BLD09-00832
| FIRE-Final Inspection | 10/3/2011 | 10/3/2011 | 10/3/2011 12:00:00 AM | P | CANC |
|
|
Jesse Phone #: ###-####
|