FIR13-00340
| INSP-Sprinkler Rough-in | 10/3/2013 | 10/3/2013 | 10/3/2013 3:41:37 PM | P | CANC |
|
|
I noted that the FDC was not located on the street side of the building. So Mike wanted to just reschedule for tomorrow.
|
FIR13-00441
| INSP-Sprinkler Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 3:36:34 PM | P | FAIL |
|
|
Todays inspection was only for the mezzanine/office area. Resubmit plans showing the pipe routing changes to the office/mezzanine area, the use of cpvc piping and flat face bushings. No piping to be covered at this time. Also noted sprinkler main piping hangers utilizing the bottom chord of the z purlins which will need approval.
|
FIR13-00506
| INSP-Sprinkler Rough-in | 10/3/2013 | 10/3/2013 | 10/3/2013 3:26:17 PM | P | PASS |
|
|
The two pendants located in the showers are ok to cover.
|
BLD13-02527
| FIRE-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 2:52:26 PM | A | FAIL |
|
|
Repair the exit sign and provide automatic release via smoke detectors for the door in the one hour rated wall between storage and retail areas.
|
FIR13-00512
| INSP-Final Inspection | 10/3/2013 | 10/3/2013 | 10/3/2013 12:41:48 PM | P | PASS |
|
|
permit finaled
|
BLD13-02661
| FIRE-Final Inspection | 10/3/2013 | 10/3/2013 | 10/3/2013 11:39:23 AM | P | PASS |
|
|
life safety passed
|
FIR13-00453
| INSP-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 10:58:30 AM | A | PASS |
|
|
IBR cover inspection passed
|
BLD11-00519
| FIRE-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 9:16:17 AM | A | PASS |
|
|
life safety passed
|
BLD13-02661
| FIRE-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 8:41:08 AM | A | FAIL |
|
|
Provide annual inspection for the fire extinguishers, provide one in the storage area, and provide approved hardware on the three exit doors as discussed
|