FIR14-00394
| INSP-Final Inspection | 10/2/2014 | 10/3/2014 | 10/6/2014 5:53:30 PM | P | DEFR |
|
|
|
FIR14-00486
| INSP-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 4:16:59 PM | P | DEFR |
|
|
|
FIR14-00712
| INSP-Sprinkler Rough-in | 10/3/2014 | 10/3/2014 | 10/3/2014 4:16:25 PM | P | PART |
|
|
UG fire supply line approved for bury.
|
BLD14-01046
| FIRE-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 3:39:41 PM | P | PASS |
|
|
Life safety inspection passed. No signature card available on site.
|
FIR14-00344
| INSP-Sprinkler Rough-in | 10/2/2014 | 10/3/2014 | 10/3/2014 2:56:29 PM | A | PART |
|
|
Rough-in inspection for portions of building B 4th floor completed to date- Items noted include; three overspaced CC2 heads, relocate one CC2 away from truss web, SW heads and supply piping are not yet installed, 2" CPVC main at the corridor and extending into one unit is not installed, two additional branchlines with CC2 heads have been installed due to draft stops and are not included on plans. The trash room, elevator lobby, data, and housekeeping areas are not piped at this time. Refer to plans for annotations.
|
BLD14-02750
| FIRE-Final Inspection | 10/3/2014 | 10/3/2014 | 10/3/2014 2:47:40 PM | P | PASS |
|
|
Scope of permit work passed life safety inspection.
|
FIR14-00665
| INSP-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 1:20:52 PM | A | PASS |
|
|
Fire alarm permit finaled. Inspection passed. Points map at panel revised to include new the new modular classroom and initiation devices.
|
FIR14-00670
| INSP-Final Inspection | 9/30/2014 | 10/3/2014 | 10/3/2014 1:16:47 PM | A | PASS |
|
|
Scope of work completed and passed site inspection. Fire alarm permit finaled.
|
FIR14-00401
| INSP-Final Inspection | 10/2/2014 | 10/3/2014 | 10/3/2014 1:15:28 PM | A | PASS |
|
|
Fire alarm work passed functional testing. Contractor to install lock and label breaker as discussed.
|