PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, October 3, 2014
.
Number of inspections:
15
Percentage of inspections complete:
93 %
Percentage of inspections not complete:
7 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
BLD13-03553
BLD-Energy code compliance
10/3/2014
10/3/2014
10/3/2014 4:06:06 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03552
BLD-Energy code compliance
10/3/2014
10/3/2014
10/3/2014 4:05:57 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03551
BLD-Framing/Rough-in
10/3/2014
10/3/2014
10/3/2014 4:05:46 PM
P
PASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03550
BLD-Framing/Rough-in
10/3/2014
10/3/2014
10/3/2014 4:05:35 PM
P
PASS
Call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-02185
BLD-Framing/Rough-in
10/2/2014
10/3/2014
10/3/2014 3:05:29 PM
P
NR
Ryan Phone #: ###-####. Needs electrical and plumbing rough in inspections first.
BLD14-00251
BLD-Final
10/2/2014
10/3/2014
10/3/2014 2:41:52 PM
P
PASS
Pete kilpatrick Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
ESC14-00559
Site Final
10/3/2014
10/3/2014
10/3/2014 2:40:18 PM
P
PASS
ESC14-00559
DOC - Permit Finaled
10/3/2014
10/3/2014
10/3/2014 2:40:10 PM
P
PASS
MIS14-00121
DOC - Permit Finaled
10/3/2014
10/3/2014
10/3/2014 2:39:29 PM
P
PASS
BLD14-01757
BLD-Final
10/3/2014
10/3/2014
10/3/2014 2:38:39 PM
P
PASS
Ed Phone #: ###-####
BLD14-01757
DOC - Permit Finaled
10/3/2014
10/3/2014
10/3/2014 2:36:52 PM
P
PASS
BLD14-02359
BLD-Framing/Rough-in
10/1/2014
10/3/2014
10/3/2014 12:11:00 PM
A
PASS
Leesa Phone #: ###-####
BLD14-00819
BLD-Framing/Rough-in
10/2/2014
10/3/2014
10/3/2014 12:03:44 PM
A
FAIL
Fireblock at electrical panel fur out at ceiling-NW corner. Foam seal around plumbing penetrartions at both restroomsabove furdown ceilings at OSB. Provide a 3rd stud at the simpson hdu8 hold downs on west wall as per detail 8 on SD1.0, also nail all double and triple studs 16D nails at 8"o.c. staggered at all hold down locations. Install full height LSL blocking with A35's at front and back popouts. Provide All backing for ADA components in restrooms. ok to insulate 1st. floor only, this framing inspection is for the first floor only. Also need a fire inspection after insulation, prior to energy code. Will Also need the city approved TI plans prior to sheet rock, due to occupancy change on 2nd. floor (A-2), changing to a seperated use. Additional fire rated construction for 1st floor will need to be verified. Correction notice posted. ok to insulate 1st. floor only.
BLD14-02204
BLD-Foundation
10/2/2014
10/3/2014
10/3/2014 9:20:09 AM
A
DONE
Mike-as early as possible Phone #: ###-####. conc was placed yesterday.
BLD13-00166
BLD-Conference
10/2/2014
10/3/2014
A