Inspections for the day of: Friday, October 3, 2014.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00062 General Inspection10/3/201410/3/201410/3/2014 3:11:10 PM PASS
curtis clean sweep has addressed the tracking issues throughout the project. no other esc issues at this time.
ESC14-00061 General Inspection10/3/201410/3/201410/3/2014 3:11:00 PM PASS
curtis clean sweep has addressed the tracking issues throughout the project. no other esc issues at this time.
ESC14-00059 General Inspection10/3/201410/3/201410/3/2014 3:10:50 PM PASS
curtis clean sweep has addressed the tracking issues throughout the project. no other esc issues at this time.
ESC13-00193 General Inspection10/3/201410/3/201410/3/2014 2:12:07 PM PASS
BMP's still in place. No esc issues at this time. no activity
ESC14-00239 General Inspection10/3/201410/3/201410/3/2014 1:13:46 PM PASS
Inspector Module didn't enter my report I performed earlier. During Inspection, minor trackout was occuring. Told RP to get it swept up by the end of the day.
ESC13-00230 General Inspection10/3/201410/3/201410/3/2014 1:12:24 PM PASS
no issues at this time
ESC14-00144 General Inspection10/3/201410/3/201410/3/2014 12:33:09 PM PASS
site is in decent shape. some minor trackout occuring from landscapers. I talked to them and they will sweep up the issues
ESC13-00077 Aging Inspection10/3/201410/3/201410/3/2014 12:10:21 PM PASS
ESC13-00074 Aging Inspection10/3/201410/3/201410/3/2014 12:10:14 PM PASS
ESC13-00067 Aging Inspection10/3/201410/3/201410/3/2014 12:09:49 PM PASS
ESC13-00073 Aging Inspection10/3/201410/3/201410/3/2014 12:09:41 PM PASS
ESC13-00075 Aging Inspection10/3/201410/3/201410/3/2014 12:09:33 PM PASS
ESC14-00942 Site Preparation10/2/201410/3/201410/3/2014 11:52:39 AMAPASS
Michael Phone #: ###-####
permit posted and bmp's in place
ESC14-00791 Site Preparation10/2/201410/3/201410/3/2014 11:04:08 AMAPASS
Brian Phone #: ###-####
Permit Posted on Fence at entrance. Contractor wants to attempt to use Recycled Asphalt for a construction road. I said thats fine, but if there are any tracking issues, they need to install a rock construction entrance, he agreed. Its approximately 1000ft from where they are disturbing earth and hauling till they hit gowen rd. Silt fence installed along the north section of the area.
ESC14-00212 General Inspection10/3/201410/3/201410/3/2014 10:24:45 AM PASS
very minimal trackout occuring. street sweeper begun sweeping. no other issues
ESC12-00130 General Inspection10/3/201410/3/201410/3/2014 9:19:48 AM PASS
wip
no esc issues at this time. no trackout or other violations
ESC14-00791 Site Preparation9/30/201410/3/201410/2/2014 10:57:04 AMAFAIL
Brian Phone #: ###-####
Permit Not Posted nor any type of BMP installed. Called RP Brian via phone and left VM to get these addressed prior to requesting another site prep inspection. I'll await to hear back from him and explain in person the City's Requirements. I disclosed to dozer operator and no grading or any other earth disturbing activities can occur before site prep approval. He agreed. He is currently installed the construction entrance