ELE16-03045
| Permanent Service | 10/3/2016 | 10/3/2016 | 10/3/2016 1:19:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Thomas Jenkins p/s o/h rec ok
|
ELE16-01207
| Final | 10/3/2016 | 10/3/2016 | 10/3/2016 1:09:57 PM | P | PASS |
|
|
John Phone #: ###-#### Corrections fixed final ok
|
ELE16-02693
| Electrical Rough-In | 9/30/2016 | 10/3/2016 | 10/3/2016 10:31:51 AM | A | PASS |
|
|
Call for inspection of masonry at stair 2 and to discuss inspections in the future at masonry walls. Phone #: ###-#### Inspection requested via web by Rafael Castillo Stair stack one ok cover, also discussed mason trying to grout proir to inspection being done
|
ELE16-03121
| Final | 9/30/2016 | 10/3/2016 | 10/3/2016 9:28:44 AM | A | CANC |
|
|
100ap Service Phone #: ###-#### Inspection requested via web by Cilnt Pierce Could not locate service, nobody on site called and left message
|
ELE16-01757
| Conference | 9/28/2016 | 10/3/2016 | 10/3/2016 9:09:43 AM | A | DONE |
|
|
After 9 // Kenneth Phone #: ###-#### Talked about main discconecting means at detached garage, establishing new grounding source and isolating ground and grounded conductors in remote panel. GFCI protection on all 120v receptacles and tamper resistant.
|
ELE16-03204
| Rough-In Permanent Service | 9/30/2016 | 10/3/2016 | 10/3/2016 8:51:13 AM | A | PASS |
|
|
Any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Rough-in ok cover p/s u/g n ok
|