FIR16-00502
| INSP-Sprinkler Rough-in | 9/30/2016 | 10/3/2016 | 10/3/2016 3:01:53 PM | P | PASS |
|
|
The underground supply piping has been modified to meet the min. bury depth. Piping can be buried.
|
FIR16-00540
| INSP-Supply line flush | 10/3/2016 | 10/3/2016 | 10/3/2016 2:42:19 PM | P | PASS |
|
|
The underground supply line hydro test passed.
|
BLD16-01942
| FIRE-Final Inspection | 9/30/2016 | 10/3/2016 | 10/3/2016 12:58:50 PM | P | PASS |
|
|
Life safety passed
|
FIR16-00579
| INSP-Final Inspection | 9/30/2016 | 10/3/2016 | 10/3/2016 12:58:18 PM | P | PASS |
|
|
Permit finaled
|
FIR16-00579
| INSP-Sprinkler Rough-in | 9/30/2016 | 10/3/2016 | 10/3/2016 12:57:57 PM | P | PASS |
|
|
Rough-in passed.
|