Inspections for the day of: Wednesday, October 3, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03424 Permanent Service10/2/201810/3/201810/3/2018 3:09:20 PMPPASS
New 200A CSED please call Kim ###-#### Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer p/s o/h rec ok
ELE17-04116 Electrical Rough-In10/2/201810/3/201810/3/2018 2:44:36 PMPPASS
Please inspect hot tub bond. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover
ELE18-03788 Temporary Service10/3/201810/3/201810/3/2018 2:44:12 PMPPASS
Inspection requested via web by Hidajet Zahic t/s u/g n ok
ELE18-03786 Temporary Service10/3/201810/3/201810/3/2018 2:43:55 PMPPASS
Inspection requested via web by Hidajet Zahic t/s u/g n ok
ELE18-03131 Final10/3/201810/3/201810/3/2018 1:16:18 PMPPASS
Phone #: ###-#### Inspection requested via web by kendall bender Ok final.
ELE18-03461 Permanent Service10/2/201810/3/201810/3/2018 1:14:51 PMACANC
Inspection requested via web by Ashley Rasmussen Service already energized. This inspection was to be a final. I added a final and scheduled it for 10/4/18.
ELE18-03295 Final10/2/201810/3/201810/3/2018 12:45:12 PMAPASS
Please call Justin ###-#### on your way to meet you there. If you have any questions please feel free to contact Luke ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final solar a long with panel change. Fees figure accordingly.
ELE18-03295 Electrical Rough-In10/3/201810/3/201810/3/2018 12:44:36 PMPPASS
All solar components UL listed
ELE18-03107 Electrical Rough-In10/2/201810/3/201810/3/2018 11:50:19 AMAPASS
wall inspection, Ken Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover E and W walls furred out. 2 exit signs and 3 emer lights.
ELE17-03370 Electrical Rough-In10/2/201810/3/201810/3/2018 11:49:45 AMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover basement B offices and corridors, basement A corridor.
ELE18-03772 Permanent Service10/2/201810/3/201810/3/2018 10:02:35 AMAPASS
This is a reinspection Phone #: ###-#### Inspection requested via web by todd cline Corrections made. Service already energized.
ELE18-03771 Final10/2/201810/3/201810/3/2018 10:00:11 AMAPASS
please call when on the way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
ELE17-04218 Final10/2/201810/3/201810/3/2018 9:55:16 AMAFAIL
Phone #: ###-#### Inspection requested via web by David McClellan
1. Up and down baths not GFI protected. Including recept down low under towel bar.
2. Light in up bath over tub needs removed and replaced with 3/0 blank.
3. 2 single pole lockouts needed for D/W and hood.
4. Connectors needed on A/C disc. Also disc need labeled A,B or 1,2. Disc on right hand side needs thhn to replace romex in flex and neutrals identified as hot conductors.
5. Couldnt verify GFI protection for floor heat mstr.
ELE18-03298 Final10/2/201810/3/201810/3/2018 9:15:45 AMAPASS
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final patio addition only. Hottub is not to be done at this time. Talked to contractor and mentioned that if they did do hottub at later date, a permit was required.
ELE13-03161 ELE-Aging Inspection10/3/201810/3/201810/3/2018 6:26:08 AM DONE
Please schedule a final inspection.
ELE13-02096 ELE-Aging Inspection10/3/201810/3/201810/3/2018 6:25:32 AM DONE
Please schedule a final inspection