ELE18-03424
| Permanent Service | 10/2/2018 | 10/3/2018 | 10/3/2018 3:09:20 PM | P | PASS |
|
|
New 200A CSED please call Kim ###-#### Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer p/s o/h rec ok
|
ELE17-04116
| Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 2:44:36 PM | P | PASS |
|
|
Please inspect hot tub bond. Phone #: ###-#### Inspection requested via web by ERIC CENTERS Ok cover
|
ELE18-03788
| Temporary Service | 10/3/2018 | 10/3/2018 | 10/3/2018 2:44:12 PM | P | PASS |
|
|
Inspection requested via web by Hidajet Zahic t/s u/g n ok
|
ELE18-03786
| Temporary Service | 10/3/2018 | 10/3/2018 | 10/3/2018 2:43:55 PM | P | PASS |
|
|
Inspection requested via web by Hidajet Zahic t/s u/g n ok
|
ELE18-03131
| Final | 10/3/2018 | 10/3/2018 | 10/3/2018 1:16:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender Ok final.
|
ELE18-03461
| Permanent Service | 10/2/2018 | 10/3/2018 | 10/3/2018 1:14:51 PM | A | CANC |
|
|
Inspection requested via web by Ashley Rasmussen Service already energized. This inspection was to be a final. I added a final and scheduled it for 10/4/18.
|
ELE18-03295
| Final | 10/2/2018 | 10/3/2018 | 10/3/2018 12:45:12 PM | A | PASS |
|
|
Please call Justin ###-#### on your way to meet you there. If you have any questions please feel free to contact Luke ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final solar a long with panel change. Fees figure accordingly.
|
ELE18-03295
| Electrical Rough-In | 10/3/2018 | 10/3/2018 | 10/3/2018 12:44:36 PM | P | PASS |
|
|
All solar components UL listed
|
ELE18-03107
| Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 11:50:19 AM | A | PASS |
|
|
wall inspection, Ken Williams is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover E and W walls furred out. 2 exit signs and 3 emer lights.
|
ELE17-03370
| Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 11:49:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover basement B offices and corridors, basement A corridor.
|
ELE18-03772
| Permanent Service | 10/2/2018 | 10/3/2018 | 10/3/2018 10:02:35 AM | A | PASS |
|
|
This is a reinspection Phone #: ###-#### Inspection requested via web by todd cline Corrections made. Service already energized.
|
ELE18-03771
| Final | 10/2/2018 | 10/3/2018 | 10/3/2018 10:00:11 AM | A | PASS |
|
|
please call when on the way ###-#### Phone #: ###-#### Inspection requested via web by Same Electric Ok final.
|
ELE17-04218
| Final | 10/2/2018 | 10/3/2018 | 10/3/2018 9:55:16 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by David McClellan 1. Up and down baths not GFI protected. Including recept down low under towel bar. 2. Light in up bath over tub needs removed and replaced with 3/0 blank. 3. 2 single pole lockouts needed for D/W and hood. 4. Connectors needed on A/C disc. Also disc need labeled A,B or 1,2. Disc on right hand side needs thhn to replace romex in flex and neutrals identified as hot conductors. 5. Couldnt verify GFI protection for floor heat mstr.
|
ELE18-03298
| Final | 10/2/2018 | 10/3/2018 | 10/3/2018 9:15:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok final patio addition only. Hottub is not to be done at this time. Talked to contractor and mentioned that if they did do hottub at later date, a permit was required.
|
ELE13-03161
| ELE-Aging Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 6:26:08 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE13-02096
| ELE-Aging Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 6:25:32 AM | | DONE |
|
|
Please schedule a final inspection
|