Inspections for the day of: Thursday, October 3, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS19-00312 BLD-Conference10/3/201910/3/201910/4/2019 8:14:38 AMPDEFR
Craig Brascher, PE, SE, with Ally Structural Consulting called and let me know he has been on site and has requested that the drywall around the two beams and colunms be removed, for futher inspection. I advised Craig, Bob and I had concern in at least two to three other areas that need futher review as well...
BLD19-03428 BLD-Foundation10/3/201910/3/201910/3/2019 4:55:33 PMPCANC
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD19-03419 BLD-Foundation10/3/201910/3/201910/3/2019 4:55:24 PMPPASS
Work in progress...
BLD19-03771 BLD-Final10/1/201910/3/201910/3/2019 4:55:02 PMAPASS
Inspection requested via web by Hans Weikl
BLD19-03771 DOC - Permit Finaled10/3/201910/3/201910/3/2019 4:54:53 PMPPASS
BLD19-01787 BLD-Framing/Rough-in10/2/201910/3/201910/3/2019 4:54:34 PMAPASS
South East side, OK to cover...
BLD19-00644 BLD-Conference10/2/201910/3/201910/3/2019 4:53:09 PMADEFR
Head room issue at, header to bottom tread, stairs to basement...
Need Enggineering approval for for floor truss modification...
BLD19-02230 BLD-Energy code compliance10/2/201910/3/201910/3/2019 12:32:20 PMAPASS
Corrections SAT...
BLD19-01939 BLD-Footing10/2/201910/3/201910/3/2019 11:17:51 AMAPASS
Work in progress...
BLD19-01857 BLD-Wall Bracing10/2/201910/3/201910/3/2019 11:17:31 AMAPART
First floor only...
Bocking to be as per plans, second story, to be inspected at framing rough-in...
BLD18-03847 BLD-Aging Inspection10/3/201910/3/201910/3/2019 8:17:02 AM DEFR
BLD18-03847 Extend Permit 90/180 days10/3/201910/3/201910/3/2019 8:16:44 AMPDONE