Inspections for the day of: Monday, October 30, 1995.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorGerry Varner
TitlePLM-INSPECTOR
Phone #447-7209
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM95-00931 INSP - Sewer line10/30/199510/30/199510/30/1995 12:00:00 AM PASS
/ / 323 - sewer line ok
PLM95-00215 INSP - Final10/27/199510/30/199510/30/1995 12:00:00 AMAPASS
10/30/95 323 - correction made --final ok
PLM95-01500 INSP - Sprinkler & Backflow10/27/199510/30/199510/30/1995 12:00:00 AMAPASS
10/27/95 323 - MAY NOT BE DOING JOB HIMSELF, SAID NEIGHBOR WAS DOING IT. WOULD DO IT HIMSELF//PER PAT ELLIS went out for inspection and found the man did not need to upgrade his sprinkler system as it was alright the way is was--permit to be
PLM95-01508 INSP - Sewer and Water lines10/30/199510/30/199510/30/1995 12:00:00 AMPPASS
10/30/95 323 - ready sewer and water final
PLM95-01510 INSP - Sewer and Water lines10/30/199510/30/199510/30/1995 12:00:00 AMPPASS
10/30/95 23 - I KNOW THIS IS STANS BUT THEY NEED A 1:00 INSPECTION AND S THIS PM///THANKS DIX sewer and water final
PLM95-01516 INSP - Sprinkler & Backflow10/30/199510/30/199510/30/1995 12:00:00 AMPFAIL
10/30/95 23 - correction needed--needs another union and plugs.
PLM95-01517 INSP - Plumbing Rough-in10/30/199510/30/199510/30/1995 12:00:00 AMPPASS
10/30/95 23 - 5 FIXTURES rough-in ok
PLM95-01140 INSP - Sewer and Water lines10/30/199510/30/199510/30/1995 12:00:00 AMPNR
10/30/95 23 - please call Bob at ###-#### not ready