BLD96-01321
| INSP-Final Inspection | 10/29/1998 | 10/30/1998 | 11/2/1998 12:00:00 AM | P | PART |
|
|
ron cell ###-#### fn insp
|
BLD97-03484
| INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | A | FAIL |
|
|
KEN ###-#### door hardware on both floors; extinguisher for hangar; address; hydrant steamer connection wring direction
|
BLD98-01122
| INSP-Final Inspection | 10/29/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | A | PART |
|
|
temp occ approved for balcony club; monitor control valves for anti-freeze loop (locked now); baffles between heads; repair leak onto balcony; calcs for new system
|
BLD98-02957
| INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | P | PASS |
|
|
HEATHER ###-#### FN FIRE-1:00 ? FOR INSP
|
BLD97-02769
| INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | P | PASS |
|
|
occ approved
|
BLD97-02948
| INSP-Final Inspection | 10/30/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | P | FAIL |
|
|
Need pump test bypass for outside flow tests.
|
BLD97-03173
| INSP-Supply line flush | 10/29/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | P | PASS |
|
|
GREG ###-#### 1:15 underground flush okay
|
BLD97-03173
| INSP-Sprinkler Rough-in/Hydro | 10/29/1998 | 10/30/1998 | 10/30/1998 12:00:00 AM | P | PART |
|
|
GREG ###-#### 1:15 checked 3rd floor - check sway bracong requirements on feed main
|