MEC02-02223
| Final | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | PART |
|
|
###-#### SUSAN ..meet at 9:30 10/29/2002 4:09:23 PM temp ok 10/30/2002 12:40:01 PM
|
MEC02-00770
| Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | PART |
|
|
BRIAN ###-#### talked about hood..needs to be 30" 10/30/2002 12:39:15 PM
|
MEC02-00770
| Pressure Test | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | CANC |
|
|
BRIAN ###-#### already done 10/30/2002 12:39:28 PM
|
MEC02-00744
| Conference | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | PASS |
|
|
BRIAN ###-#### clear on f/p ok 10/30/2002 12:39:49 PM
|
MEC02-03145
| Pressure Test | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | FAIL |
|
|
###-#### the guy thought we would be putting the guage and test on..so he will recall this 10/30/2002 4:15:32 PM
|
MEC02-03145
| Final | 10/29/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | A | NR |
|
|
|
MEC02-03147
| Pressure Test | 10/30/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | P | FAIL |
|
|
pres test for homeowner- irene-hard of hearing ###-#### -call 1st before insp
|
MEC02-03147
| Final | 10/30/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | P | NR |
|
|
for homeowner--irene-hard of hearing -call 1st before insp- ###-####- pound on door when arriving....
|
MEC02-03103
| Rough-in | 10/30/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 08:41:44. Contact: ###-####.
|
MEC02-02880
| Pressure Test | 10/30/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | P | PART |
|
|
gage on outside of building don't need access gas ok..nobody home 10/30/2002 3:50:07 PM
|
MEC01-02433
| Final | 10/30/2002 | 10/30/2002 | 10/30/2002 12:00:00 AM | P | CANC |
|
|
Final inspection request for restroom. Greg @ FM, ###-####. need ok from structural ok to reopen expired permit 10/30/2002 4:58:54 PM
|